5. If the mount is being fitted under the leg of a vessel, verify that the leg’s center line 

passes through the center of the top plate (through the center of the load cell). 

6. Lower the corner or side of the vessel carefully onto the top plate. The force of a 

vessel weighing several tons can damage a load cell if dropped only a fraction of an 

inch.

7. With the top plate positioned approximately level, mark holes for attaching the top 

plate to the vessel’s mounting surface. 

8. Drill holes and attach top plate loosely to vessel with suitable fasteners.

9. Verify that there is no initial misalignment between the base plate and top plate.

10.Attach the base plates to the foundation using suitable anchors for concrete or by 

bolting or welding to a steel structure or sub-plate. Verify that the base plates are as 

level as possible. They should be fully supported. Shimming is not recommended.

11.Check that the top plates are no more than ±.5° out or level. Shim if necessary and 

fully tighten mounting bolts.

12.Repeat steps 4-11 for the mounting assemblies at the remaining corners or sides.

13.To achieve equal load distribution, final height adjustments can be made with shims 

between the top plate loading bracket and the weighing vessel. The variation in load 

among the cells should be no more than 20%. The load distribution can be checked 

accurately by exciting each load cell in turn and measuring the output with a 

voltmeter.

14.Consider using a bead of flexible caulk between the load cell and the base on lighter 

capacity assemblies. This will prevent debris from lodging between the load cell and 

the base and causing repeatability or accuracy problems.

Weigh modules are assembled, with Locktite

®

, at the factory and should not require 

adjustment.

Do NOT attempt to adjust the center bolt unless removing the load cell for 

replacement purposes. This bolt is factory adjusted and any attempt to 

loosen or tighten this bolt will void the warranty. It is normal for there to be 

movement between the load cell and center bolt.

If they have been disassembled for any reason, perform the following:

• Remove the large center screw.

• Align the convex load disc and the load cell with the center hole in the base plate.

• Apply Locktite and install the large screw and continue to turn until the rubber o-

ring just contacts the convex load disc.

• Back the screw off 1/4 turn. The screw provides lateral restraint and lift off 

protection. 

Never remove it or back it off more than the suggested amount

.

Note

Содержание RL9000 Series

Страница 1: ...RL9000 Series Weigh Module Kit Models TWM TWM HT Installation Manual PN 89284 Rev B July 1 2019...

Страница 2: ...marks of their respective companies All information contained within this publication is to the best of our knowledge complete and accurate at the time of publication Rice Lake Weighing Systems reserv...

Страница 3: ...234 9171 and asking for the training department 1 0 Introduction 1 1 1 Overview 1 1 1 1 Features 1 1 2 Safety Section 2 2 0 Load Cell Wiring 3 2 1 Junction Box Connections Adjustments and Calibration...

Страница 4: ...RL9000 Series Weigh Module Kit ii Visit our website www RiceLake com...

Страница 5: ...b load cells and transmit the load via a spherical washer on the load bearing hub of the cell The shear web design eases load cell installation and replacement without the need to raise the weighed ve...

Страница 6: ...ctions are understood Contact any Rice Lake Weighing Systems dealer for replacement manuals Failure to heed may result in serious injury or death Before attempting to operate this unit make sure every...

Страница 7: ...unction box Attach load cell cable to the dead structure Figure 2 1 Drip Loop 3 If conduit protection is needed against mechanical or rodent damage to the load cell cables use flexible conduit and con...

Страница 8: ...unction box If the problem is not found 1 Check possible indicator malfunction by using a load cell simulator to input a known good signal into the indicator 2 Disconnect each load cell s signal leads...

Страница 9: ...no more than 20 Add shims as needed to achieve correct load distribution Take extreme care to prevent overload damage A tank or hopper can exert huge forces when dropped only a fraction of an inch It...

Страница 10: ...embly Three areas which commonly cause accuracy problems to consider Are the supporting legs adequately braced so they will not spread when the system is fully loaded Does the supporting structure hav...

Страница 11: ...load distribution final height adjustments can be made with shims between the top plate loading bracket and the weighing vessel The variation in load among the cells should be no more than 20 The load...

Страница 12: ...city A B1 C D E F G H I Conduit Adapter 1K 10K 4 0 2 0 3 25 3 5 0 4 3 8 16 1 35 0 375 0 75 N A 15K 4 0 2 0 3 25 3 5 0 4 3 8 16 1 60 0 625 0 75 N A 20 50K 7 0 3 75 5 50 6 0 0 63 1 2 13 2 48 0 75 1 3 1...

Страница 13: ...Rights Reserved 9 5 2 150K to 200K Assembly Dimensions Inches Rated Capacity A B2 C D E F G H I Conduit Adapter 150K 200K 10 0 7 825 8 0 9 0 1 1 1 14 4 75 2 0 1 7 1 2 14 NPT Table 5 2 150 200K Assemb...

Страница 14: ...www RiceLake com 5 3 250K to 450K Assembly Dimensions Inches Rated Capacity A B2 C D E F G H I Conduit Adapter 250K 450K 11 0 7 75 9 0 9 0 1 3 7 8 14 6 42 3 0 2 25 1 2 14 NPT Table 5 3 250 450K Assemb...

Страница 15: ......

Страница 16: ...Canada Mexico 800 321 6703 International 715 234 9171 Europe 31 0 26 472 1319 Rice Lake Weighing Systems is an ISO 9001 registered company Rice Lake Weighing Systems Specifications subject to change w...

Отзывы: