
Operation
© Rice Lake Weighing Systems
●
All Rights Reserved
3
2.0
Operation
This section includes the basic operation procedures to get the Dyna-Clamp working out of the box.
2.1 Unpacking
Immediately after unpacking the Dyna-Clamp from the shipping container, visually inspect the product to ensure all components
are included and undamaged. If parts were damaged in shipment, notify Rice Lake Weighing Systems and the shipper
immediately. Retain the shipping container for future shipping or transporting of the unit.
2.1.1 Battery Installation
Batteries do not come pre-installed in the Dyna-Clamp. See
for initial installation of the two (2) included
AA cell 1.5 V alkaline batteries.
Remove the batteries prior to storing to prevent possible battery corrosion if the Dyna-Clamp is not going to be
used for an extended period of time.
2.2 Product Dimensions
Figure 2-1. Product Diagram
2.3 Power
Press
to turn on the Dyna-Clamp. The startup sequence displays all LCD segments, followed briefly by the software
version number and the battery volt level. After the startup sequence is complete, the primary display area of the Dyna-Clamp
enters tension mode.
2.4 Wire Rope Selection
Press
to scroll through the available wire rope options in the secondary display area. The wire rope selection needs to
be made before Zeroing the Dyna-Clamp.
The F1-key is setup to the Scroll function by default. See
The Dyna-Clamp is factory calibrated for up to eight (8) wire rope diameters. Calibrations may only be performed by
Rice Lake Weighing Systems. Please contact Rice Lake Weighing Systems for calibration assistance or if additional
wire rope calibrations are required.
A
B
C
D
25.7'' (652.8 mm)
7.3'' (185.5 mm)
13.75–15.5'' (349.3–393.7 mm)
3.7'' (94.0 mm)
Table 2-1. Product Dimensions
IMPORTANT
C
B
A
D
F1
Note
Содержание MSI Dyna-Clamp
Страница 1: ...MSI Dyna Clamp Tension Meter Operation Manual May 19 2020 PN 193853 Rev A...
Страница 19: ......