Position the unit so the backhoe swing post is over
the center line of the trench connection. Dig with the
backhoe at extreme swing positions, and in as close
to the stabilizers as possible. Pile the soil on the
opposite side of the trenches.
Position the unit forward with the lift and crowd levers so
the two trenches can be connected. Pile the spoil on the
opposite side of the trench.
SIDE SLOPE EXCAVATING OR TRENCHING
Dig with the backhoe uphill whenever possible.
Level the backhoe on slopes with the stabilizers to dig
plumb trenches, or use the backhoe or loader to cut a level
slot for the uphill wheel and stabilizer. Pile the slot on the
low side.
Содержание RHINO 95C
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 19: ...SAFETY F 4145 01 11 Safety Section 1 15 2011 Alamo Group Inc SAFETY Decal Location...
Страница 24: ......
Страница 25: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 28: ...INTRODUCTION F 4145 01 11 Introduction Section 2 4 2011 Alamo Group Inc INTRODUCTION...
Страница 29: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 33: ...Operation Section 4 1 OPERATION SECTION...
Страница 42: ......
Страница 43: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 50: ...MAINTENANCE F 4145 01 11 Maintenance Section 5 8 2011 Alamo Group Inc MAINTENANCE...
Страница 52: ...MAINTENANCE F 4145 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE PROPER TORQUE FOR FASTENERS...
Страница 53: ......
Страница 56: ...95C SOM 01 11 P N F 4145C Printed U S A...