OPERATION
OPERA
TION
Operation Section 4-13
© 2005 Alamo Group Inc.
8650-AR 01//05
"
Check that the main driveline is securely attached
to the tractor and the locking collar is seated in
the groove of the PTO shaft.
"
Check that the snow blower driveline is securely
attached.
"
Inspect that the snow blower pivot pins are the
proper size, correctly installed, and secured to the
tractor lift arms with retaining pins inserted.
7.2 Snow Blower Pre-Operation Inspection/Service
Before each implement use, a complete inspection and
service is required to ensure the implement is in a good
and safe working condition. Damaged and/or broken
parts should be repaired and/or replaced immediately.
To ensure the implement is ready for operation, conduct
the following.
"
Ensure that the Manual Holder secured to the
Implement with the Operator’s Manual inside.
"
Ensure all decals are in place and legible. Replace
missing, worn, and unlegible decals.
NOTE:
The snow blower Operator’s Manual and affixed
Decals contain important instructions on the safe and
proper use of the snow blower. Maintain these important
safety features on the snow blower in good condition
to ensure the information is available to the operator at
all times.
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to manufacturer
recommendations. The following is a partial list of items
requiring inspection:
"
Tire condition/air pressure
"
Wheel lug bolts
"
Steering linkage
"
PTO shield
"
SMV sign is clean and visible
"
Tractor’s lights are clean and functional
"
Tractor Seat belt is in good condition
"
Tractor cab or ROPS is in good condition
"
ROPS is in the raised position
"
No tractor oil leaks
"
Radiator free of debris
"
Engine oil level and condition
"
Engine coolant level and condition
"
Power brake fluid level
"
Power steering fluid level
"
Fuel condition and level
"
Sufficient lubrication at all lube points
"
Air filter condition
7.1 Tractor Pre-Operation Inspection/Service
Содержание 8650-AR
Страница 5: ...SAFETY SECTION Safety Section 1 1...
Страница 26: ...Safety Section 1 22 8650 AR 01 05 SAFETY 2005 Alamo Group Inc SAFETY Item25 RotatingDriveline P N00756005...
Страница 28: ......
Страница 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...ASSEMBLY SECTION Assembly Section 2 1...
Страница 38: ......
Страница 39: ...OPERATION SECTION Operation Section 4 1...
Страница 71: ...MAINTENANCE SECTION Maintenance Section 5 1...
Страница 78: ...8650 AR SOM 01 05 Printed U S A P N 5039C...
Страница 81: ......
Страница 83: ......