INTRODUCTION
4211B 02/10
Introduction Section 2-5
© 2010 Alamo Group Inc.
INTRODUCTION
Attention Owner/Operator
BEFORE OPERATING THIS MACHINE:
1. Carefully read the Operator’s Manual, completely understand the Safety Messages and instructions, and
know how to operate correctly both the tractor and implement.
2. Fill out the Warranty Card in full. Be sure to answer all questions, including the Serial Number of the
implement. Mail within 30 days of delivery date of this implement.
NOTE:
Warranties are honored only if completed “Owner Registration and Warranty” forms are received by
Alamo Group within thirty days of delivery of the implement.
3. Record the Loader Model and Serial Numbers on the Warranty page. Keep this as part of the permanent
maintenance file for the implement.
Содержание 4211B
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 28: ......
Страница 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 34: ......
Страница 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 46: ......
Страница 47: ...Operation Section 4 1 OPERATION SECTION...
Страница 90: ......
Страница 91: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Страница 100: ...MAINTENANCE 4211B 02 10 Maintenance Section 5 10 2010 Alamo Group Inc MAINTENANCE...
Страница 101: ...MAINTENANCE 4211B 02 10 Maintenance Section 5 11 2010 Alamo Group Inc MAINTENANCE...
Страница 104: ...4211B SOM 02 10 P N F 4253C Printed U S A 4211B LOADER...