OPERATION
2407TL 01/11
Operation Section 4-32
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING LOW TRUCKS OR SPREADERS FROM A PILE
For faster loading, minimize angle of turn and
length of run between pile and spreader. Back
grade occasionally with a loaded bucket to keep
working surface free of ruts and holes. Also, hold lift
control forward so full weight of bucket is scraping
ground.
Do not roll bucket over and attempt to backgrade.
This type of use can cause severe overloading of
bucket cylinders when fully extended, possibly
causing bucket cylinder rods to become bent.
Содержание 2407TL
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 40: ......
Страница 41: ...Operation Section 4 1 OPERATION SECTION...
Страница 84: ......
Страница 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Страница 97: ......
Страница 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...