OPERATION
2407TL 01/11
Operation Section 4-29
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING FROM A BANK
Choose a forward gear that provides sufficient
ground speed for loading.
Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low as
possible for maximum efficiency. Loader lift and
breakaway capacity diminish as loading height is
increased.
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Содержание 2407TL
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 32: ......
Страница 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 40: ......
Страница 41: ...Operation Section 4 1 OPERATION SECTION...
Страница 84: ......
Страница 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Страница 97: ......
Страница 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...