Assembly Instructions
Shed House Style 12 x 12 x 8
branches or other falling items may cause puncture or
tears in the cover material.
Take notice of drainage around your intended location.
Water draining from the surrounding terrain should be
planned so that it does not run into the unit. As well, rain
or melting snow that comes off the unit should be drained
away rather than accumulate and pool around the unit.
Check to be certain that adequate clearance is allowed for
entry and exit from ends of unit. As unit has different door
openings on each end, ideally contents can be inserted or
removed from either end.
V2.2
3
FRAME ASSEMBLY
Step1.
Assemble the Front and Rear End Arches(2) using
(1) Top Crest #TC-2000, (2) Bent Tube Side Crest #BTSC-
2006 and (2) End Upright w/Foot #EUL-2002 for each one.
Use (4) #CBN-3005-2 carriage bolts with nuts and
washers through pre-drilled holes in frame members.
Be certain to insert carriage bolts from the outer edge into
the interior of the unit, with the washers and nuts on the
inside of the arches. This will avoid tearing the fabric on
doors and main cover when installed. Do not tighten the
nuts completely until the frame is completed and set in
place.
Step 2
. Assemble the (2) Corner Wind Braces #CW-2005
to the End Upright w/Foot #EUL-2002 to the first of the
End Arch assemblies. Use a #CBN-3005-2 Carriage Bolt
with Washer and Nut to secure the braces loosely to the
Upright. Do not tighten completely.
Step 3
. Assemble the remaining two interior arches using
(1) Top Crest Tube #TC-2000, (2) Bent Tube Side Crest
#BTSC-2006, and (2) Center Straight Upright #CSU-2001
for each of the arches. Use CBN-3000-2 carriage bolts
with washers and nuts in the pre-drilled holes, aligned to
form the arch.
Step 4
. Support the End Arch with Wind Braces
temporarily in the vertical position. Connect (4) SCR-2004
Swedged Cross Rails to the End Arch with (4) CBN-3005-
3 carriage bolts, washers, and nuts through the pre-drilled
holes in the arch members. The Swedged end of the
Cross Rails should face the interior of the unit to accept
the next cross rail. The Cross Rails should be put into the
bottom and side hole of the arch upright. Again, don’t
tighten the hardware until the next arch and cross rails are
assembled. It is very important to make certain all nuts
are on the inside of the unit to avoid damaging the cover
when put on.
Stand an interior arch assembly up vertically into position,
so the cross rails align with the holes in the interior arch.
Using (4) Carriage Bolts #CBN-3000-3 with nuts and
washers, connect the cross rails between the end arch and
the first interior arch assemblies. Connect the (2) Wind
Braces #CW-2005 diagonally across the end and interior
arch as shown in the frame illustration.
SCR-2004 Top
Ridge Rail
Step 5
. Begin the Top Ridge Rail by placing a Swedged
Cross Rail underneath the End Top Crest Tube. Secure
the Cross Rail loosely with a Carriage Bolt#
CBN-3005-3
with washer and nut facing the interior of the unit.
Step 6.
Add remaining 3 middle arches and rear end arch
in the same fashion. Note that the Plain end of Swedged
Cross Rail should fasten under the End Top Crest Arch
and the Swedged End above middle Top Crest arch.
NOTE: Do not completely tighten bolts that connect the
Cross Rails to the End Arches. They must be removed for
proper for End Panel Zippered Door installation
Step 7
. Move the frame assembly into its final installation
location. This should be done with at least one person
lifting each side or corner to avoid bending or stressing
any frame members. Frame should now be squared up in
position. Measure from diagonally from inside corner to
EUL-2002
End Upright w/Foot
TC-2000 Top
Crest Tube
BTSC-2006
Bent Tube Side
Crest
CW-2005 Corner
Wind Brace
SCR-2004 Side
Cross Rail
CSU-2001
Center
Straight
Upright