Assembly Instructions
Shed House Style 12 x 12 x 8
4
EUL-2002
End Upright w/Foot A & B
8
BTSC-2006
Bent Tube Side Crest
4
TC-2000
Top Crest Tube
4
CSU-2001
Center Straight Uprights
2
CW-2005
Corner Wind Brace
10
SCR-2004
Swedged Cross Rails M/F
5
ECR-2003
End Cross Rails F/F
8 TB-3004
Turnbuckles
20
CBN-3005-3
Carriage Bolts – 3 1/4”
10
CBN-3005-2
Carriage Bolts – 2 1/8”
30 CBN-3005-N 3/8”
Nuts
30
CBN-3005-W Washers – 3/8” Curved
2 R-3003
3/16”
Rope
4
BC-36
Bungee Cord Hold Ups
4 DBA-3000 Earth
Cable
Anchors
4
UB-3002
U Bolts with Nuts
1 DR-3001
36”
Drive
Rod
4
EP-1000
1-5/8” Plastic End Plugs
10
EP-1001
1” Plastic End Plugs
P
u
a
Swedged
Cross Rail M/F
Swedged
Cross Rail F/F
Bent Tube
Side Crest
Top Crest Tube
End Upright
w/Foot A
End Upright
w/Foot B
Center Side
Upright
Wind Brace
Bent Tube
Side Crest
Bent Tube
Side Crest
Bent Tube
Side Crest
Wind Brace
End Upright
w/Foot A
Swedged
Cross Rail M/F
Swedged
Cross Rail M/F
Swedged
Cross Rail M/F
Swedged
Cross Rail F/F
Swedged
Cross Rail F/F
Swedged
Cross Rail F/F
Top Crest Tube
Top Crest Tube
Top Crest Tube
Swedged
Cross Rail M/F
Swedged
Cross Rail M/F
Swedged
Cross Rail M/F
End Upright
w/Foot B
Center Side
Upright
Swedged
Cross Rail M/F
Swedged
Cross Rail M/F
SITE PREPARATION
Select a level or as close to level as practical location for
your Rhino Shelter unit. The unit should be placed on a
base of materials suitable for the storage load to be
protected. The unit should not be located under trees,
which will shed hard fruit such as apples, walnuts, or
heavy pine cones. The cover of your unit will protect
against normally leaves and light debris, however large
V2.2
2