INSTALLATION
Choosing a Location (cont�)
For Units With Space
Limitations
In the event that a space limitation exists, we will
permit the following clearances:
Single-Unit Applications: Clearances below 6"
[15.2 cm] will reduce unit capacity and efficiency.
Do not reduce the 60" [152.4 cm] discharge or the
24" [61.0 cm] service clearances.
Multiple-Unit Applications: When multiple
condenser grille sides are aligned, a 6" [15.2 cm]
per unit clearance is recommended for a total of
12" [30.5 cm] between two units. Two combined
clearances below 12" [30.5 cm] will reduce
capacity and efficiency. Do not reduce the 60"
[152.4 cm] discharge or 24" [61.0 cm] service
clearances�
Customer Satisfaction Issues
• The heat pump should be located away from the
living, sleeping, and recreational spaces of the
owner and those spaces on adjoining property�
• To prevent noise transmission, the mounting pad
for the outdoor unit should not be connected to
the structure and should be located a sufficient
distance above grade to prevent ground water
from entering the unit�
Unit Mounting
WARNING:
Secure an elevated unit
and its elevating stand in order to prevent tipping�
Failure to do so may result in severe personal
injury or death�
Elevation of Unit
If elevating the heat pump, either on a flat roof or
on a slab, observe the following guidelines�
• If elevating a unit on a flat roof, use 4" x 4"
[10.2 cm x 10.2 cm] or equivalent stringers
positioned to distribute unit weight evenly and
prevent noise and vibration�
• Where snowfall is anticipated, raise the unit
above the base pad to prevent ice buildup and
coil damage� Mount the unit high enough to be
above the average accumulated area snowfall�
See “Ground Snow Depth” chart on page 9 for
representative snow depths�
NOTICE:
Do not block drain openings on
bottom of unit�
• If unit must be elevated because of anticipated
snowfall, secure unit and elevating stand such
that unit and/or stand will not tip over or fall off�
Keep in mind that someone may try to climb on
unit�
Factory-Preferred Tie-Down
Method for High Wind or
Seismic Loads
IMPORTANT:
The manufacturer-
approved/recommended method is a guide to
securing equipment for wind and seismic loads�
Other methods might provide the same result, but
the manufacturer method is the only one endorsed
by the manufacturer for securing equipment where
wind or earthquake damage can occur� Additional
information is available in the PTS (Product
Technical Support) section of the manufacturer’s
Web sites Rheemote�net, MyRheem�com, or
MyRuud�com and can be found as a listing under
each outdoor model� If you do not have access to
this site, your distributor can offer assistance�
Location
12” Min. (305 mm) 24”
[610 MM]
RECOMMENDED
SERVICE PANELS/
INLET CONNECTIONS
/ HIGH & LOW
VOLTAGE ACCESS
ALLOW 24” [ 610 mm] OF
CLEARANCE
ALLOW 60” [1524 mm]
OF CLEARANCE
AIR INLET LOUVERS ALLOW
6” [152 mm] Min. OF
CLEARANCE ALL SIDES
12” [305 mm] RECOMMENDED
ST-A1226-04-00
ST-A1226-03-00
ELEVATE ABOVE
ANTICIPATE HIGH
SNOW FALL
DO NOT BLOCK
OPENINGS
IN BASE PAN
BASE PAD
(CONCRETE OR OTHER SUITABLE
MATERIAL)
Содержание RP14 14 SEER
Страница 43: ...43 FOR SINGLE PHASE WITH PSC FAN MOTORS WIRING DIAGRAMS Wiring Diagrams...
Страница 44: ...44 WIRING DIAGRAMS 3 PHASE 208 230V MODELS Wiring Diagrams...
Страница 45: ...45 Wiring Diagrams WIRING DIAGRAMS FOR 3 PHASE 460 575V...
Страница 46: ...46...
Страница 47: ...47...
Страница 48: ...48 CM 0614...