![Rheem RP14 14 SEER Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/rheem/rp14-14-seer/rp14-14-seer_installation-instructions-manual_1451499016.webp)
16
Tubing
INSTALLATION
Interconnecting Tubing (cont�)
Figure 5
Insulated liquid and
sucon line
TXV or EEV at indoor
evaporator
Reference Table 2
for elevaon
limitaons
Verify sub-cooling prior
to throling device
Outdoor Unit Above Indoor Unit
For applications that are considered to have a long
line set with the outdoor unit above the indoor unit
the following is required:
• TXV at the indoor unit
• Crankcase heater
• Start components maybe required depending
upon quality of voltage
• Insulated liquid and suction line
• Follow the proper line sizing, equivalent length,
charging requirements, and oil level adjustments
spelled out in this document and the outdoor
units I&O
• Verify adequate sub-cooling at the ID unit prior
to throttling device
Содержание RP14 14 SEER
Страница 43: ...43 FOR SINGLE PHASE WITH PSC FAN MOTORS WIRING DIAGRAMS Wiring Diagrams...
Страница 44: ...44 WIRING DIAGRAMS 3 PHASE 208 230V MODELS Wiring Diagrams...
Страница 45: ...45 Wiring Diagrams WIRING DIAGRAMS FOR 3 PHASE 460 575V...
Страница 46: ...46...
Страница 47: ...47...
Страница 48: ...48 CM 0614...