![Rheem RKNA SERIES Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/rheem/rkna-series/rkna-series_installation-instructions-manual_1451496007.webp)
7
B. OUTSIDE SLAB INSTALLATION
(Typic
a
l outdoor sl
a
b inst
a
ll
a
tion is shown in Figure 5.)
1. Select
a
loc
a
tion where extern
a
l w
a
ter dr
a
in
a
ge c
a
nnot collect
a
round unit.
2. Provide
a
level sl
a
b sufficiently high enough
a
bove gr
a
de to prevent surf
a
ce w
a
ter
from entering the unit
3. The loc
a
tion of the unit should be such
a
s to provide proper
a
ccess for inspection
a
nd servicing
a
s shown in Figure 7.
4. Loc
a
te unit where oper
a
ting sounds will not disturb owner or neighbors.
5. Loc
a
te unit so roof runoff w
a
ter does not pour directly on the unit. Provide gutter or
other shielding
a
t roof level. Do not loc
a
te unit in
a
n
a
re
a
where excessive snow
drifting m
a
y occur or
a
ccumul
a
te.
6. Where snowf
a
ll is
a
nticip
a
ted, the height of the unit
a
bove the ground level must be
considered. Mount unit high enough to be
a
bove
a
nticip
a
ted m
a
ximum
a
re
a
snowf
a
ll
a
nd to
a
llow combustion
a
ir to enter the combustion
a
ir inlet.
7. Select
a
n
a
re
a
which will keep the
a
re
a
s of the vent,
a
ir int
a
ke,
a
nd A/C condenser
fins free
a
nd cle
a
r of obstructions such
a
s weeds, shrubs, vines, snow, etc. Inform
the user
a
ccordingly.
8
. Remove compressor shipping supports (if so equipped)
a
fter inst
a
ll
a
tion.
!
WARNING
THESE UNITS ARE DESIGNED CERTIFIED FOR OUTDOOR INSTALLATION
ONLY. INSTALLATION INSIDE ANY PART OF A STRUCTURE CAN RESULT IN
INADEQUATE UNIT PERFORMANCE AS WELL AS PROPERTY DAMAGE.
INSTALLATION INSIDE CAN ALSO CAUSE RECIRCULATION OF FLUE PROD-
UCTS INTO THE CONDITIONED SPACE RESULTING IN PERSONAL INJURY
FIGURE 5
OUTSIDE SLAB INSTALLATION. CLOSET DISTRIBUTION SYSTEM. SLAB FLOOR CONSTRUCTION.
I29
8
!
WARNING
THIS UNIT MAY BE USED TO HEAT
THE BUILDING OR STRUCTURE
DURING CONSTRUCTION IF THE
FOLLOWING INSTALLATION
REQUIREMENTS ARE MET.
INSTALLATION MUST COMPLY
WITH ALL INSTALLATION
INSTRUCTIONS INCLUDING:
• PROPER VENT INSTALLATION;
• FURNACE OPERATING UNDER
THERMOSTATIC CONTROL;
• RETURN AIR DUCT SEALED TO
THE FURNACE;
• AIR FILTERS IN PLACE;
• SET FURNACE INPUT RATE AND
TEMPERATURE RISE PER RAT-
ING PLATE MARKING;
• MEANS OF PROVIDING OUT-
DOOR AIR REQUIRED FOR COM-
BUSTION;
• RETURN AIR TEMPERATURE
MAINTAINED BETWEEN 55°F
(13°C) AND 80°F (27°C); AND
• INSTALLATION OF EXHAUST
AND COMBUSTION AIR INLET
HOODS COMPLETED;
• CLEAN FURNACE, DUCT WORK
AND COMPONENTS UPON SUB-
STANTIAL COMPLETION OF THE
CONSTRUCTION PROCESS, AND
VERIFY FURNACE OPERATING
CONDITIONS INCLUDING IGNI-
TION, INPUT RATE, TEMPERA-
TURE RISE AND VENTING,
ACCORDING TO THE INSTRUC-
TIONS.
Содержание RKNA SERIES
Страница 5: ...5 FIGURE 3 CABINET DIMENSIONS AND ACCESS LOCATIONS FIGURE 4 SUPPLY AND RETURN DIMENSIONS I282 I288...
Страница 24: ...24 FIGURE 20 FIGURE 21 INTEGRATED FURNACE CONTROL SPEED TAP BLOCK FIGURE 22...
Страница 25: ...25 FIGURE 22 Continued...
Страница 55: ...55 FIGURE 23 WIRING DIAGRAM...
Страница 56: ...56 FIGURE 24 WIRING DIAGRAM...
Страница 57: ...57 FIGURE 25 WIRING DIAGRAM...
Страница 58: ...58 FIGURE 26 WIRING DIAGRAM...
Страница 59: ...59 FIGURE 27 WIRING DIAGRAM...
Страница 60: ...60 FIGURE 28 WIRING DIAGRAM...
Страница 61: ...61 FIGURE 29 WIRING DIAGRAM...
Страница 62: ...62 FIGURE 30 SYSTEM CHARGE CHARTS 3 TON COOLING 13 SEER...
Страница 63: ...63 FIGURE 31 SYSTEM CHARGE CHARTS 3 5 TON COOLING 13 SEER...
Страница 64: ...64 FIGURE 32 SYSTEM CHARGE CHARTS 4 TON COOLING 13 SEER...
Страница 65: ...65 FIGURE 33 SYSTEM CHARGE CHARTS 5 TON COOLING 13 SEER...