30
RXGY-G02 SIDE WALL VENT
This termination for horizontal venting
only.
IMPORTANT:
Do not install on the
prevailing winter wind side of the
structure. Observe same clearances
specified for horizontal, standard
termination.
NOTE:
Multi-venting-No common
venting.
NOTE:
Install the vent and air intake
piping into the vent plate openings.
Seal all gaps between the pipes and
wall.
Be Sure To Use Silicone
Sealant
to seal the vent pipe to the
vent cap to permit field disassembly
for annual inspection and cleaning.
Also seal all pipe penetrations in wall.
To prevent possibility of condensate
freeze-up or recirculation,
do not
install vent kits one above the
other.
NOTE:
The vent illustration in Figure
27 can be used for Non-direct vent
terminations also.
FIGURE 27
VENT KIT INSTALLATION OPTIONS
FIGURE 26
VENT KIT INSTALLATION OPTIONS
EXHAUST
AIR
INTAKE
For 90000 thr
u
120000 BTUH models-
red
u
ce to a len
g
th between 12 inches
and 30 inches of 2 inch pipe.
for 45000 thr
u
75000 BTUH models-
when 3 inch pipe is
u
sed: red
u
ce last 30
inches to 18 inches of 2 inch pipe and
12 inches of 1-1/2 inch pipe to maintain
velocity.
Note:
Vent sho
u
ld protr
u
de a
maxim
u
m of 2-1/4Ó beyond vent plate.
Air intake sho
u
ld protr
u
de a maxim
u
m
of 1 inch beyond vent plate.
Seal all wall cavities
Содержание Gra Series
Страница 58: ...58 FIGURE 57 GRA MODELS WITH UT ELECTRONIC CONTROLS 1028 928 SPARK IGNITION...
Страница 59: ...59 FIGURE 58 GTA MODELS WITH UT ELECTRONIC CONTROLS 1028 928 SPARK IGNITION...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64 CM 0407...