USE ONLY WITH TYPE OF GAS
APPROVED FOR THIS UNIT. REFER
TO THE UNIT RATING PLATE.
WARNING
INSTALL THIS UNIT ONLY IN A
LOCATION AND POSITION AS SPEC-
IFIED IN THE LOCATION REQUIRE-
MENTS AND CONSIDERATIONS
SECTION OF THESE INSTRUCTIONS.
PROVIDE ADEQUATE COMBUSTION
AND VENTILATION AIR TO THE UNIT
SPACE AS SPECIFIED IN THE VENT-
ING SECTION OF THESE INSTRUC-
TIONS.
WARNING
PROVIDE ADEQUATE COMBUSTION
AND VENTILATION AIR TO THE UNIT
SPACE AS SPECIFIED IN THE COM-
BUSTION AND VENTILATION AIR
SECTION OF THESE INSTRUCTIONS.
WARNING
COMBUSTION PRODUCTS MUST
BE DISCHARGED OUTDOORS.
CONNECT THIS UNIT TO AN
APPROVED VENT SYSTEM ONLY,
AS SPECIFIED IN VENT PIPE
INSTALLATION SECTION OF THESE
INSTRUCTIONS.
WARNING
5
SAFETY INFORMATION
!
!
!
!
ALWAYS INSTALL UNIT TO OPERATE WITHIN THE UNIT’S INTENDED TEM
-
PERATURE-RISE RANGE WITH A DUCT SYSTEM WHICH HAS AN EXTER-
NAL STATIC PRESSURE WITHIN THE ALLOWABLE RANGE, AS SPECIFIED
IN DUCTING SECTION OF THESE INSTRUCTIONS. SEE ALSO UNIT RATING
PLATE.
WARNING
!
NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME. USE A COMMER-
CIALLY AVAILABLE SOAP SOLUTION MADE SPECIFICALLY FOR THE
DETECTION OF LEAKS TO CHECK ALL CONNECTIONS, AS SPECIFIED IN
GAS SUPPLY AND PIPING SECTION OF THESE INSTRUCTIONS.
WARNING
!
WHEN A UNIT IS INSTALLED SO THAT SUPPLY DUCTS CARRY AIR CIRCU-
LATED BY THE UNIT TO AREAS OUTSIDE THE SPACE CONTAINING THE
UNIT, THE RETURN AIR SHALL ALSO BE HANDLED BY DUCT(S) SEALED
TO THE UNIT CASING AND TERMINATING OUTSIDE THE SPACE CONTAIN-
ING THE UNIT.
WARNING
!
THIS UNIT MAY BE USED TO HEAT THE BUILDING OR STRUCTURE
DURING CONSTRUCTION IF THE FOLLOWING INSTALLATION REQUIRE-
MENTS ARE MET. INSTALLATION MUST COMPLY WITH ALL INSTALLA-
TION INSTRUCTIONS INCLUDING:
• PROPER VENT INSTALLATION;
• FURNACE OPERATING UNDER THERMOSTATIC CONTROL;
• RETURN AIR DUCT SEALED TO THE FURNACE;
• AIR FILTERS IN PLACE;
• SET FURNACE INPUT RATE AND TEMPERATURE RISE PER RATING
PLATE MARKING;
• MEANS OF PROVIDING OUTDOOR AIR REQUIRED FOR COMBUSTION;
• RETURN AIR TEMPERATURE MAINTAINED BETWEEN 55°F (13°C) AND
80°F (27°C); AND
• INSTALLATION OF EXHAUST AND COMBUSTION AIR INLET HOODS
COMPLETED;
• CLEAN FURNACE, DUCT WORK AND COMPONENTS UPON SUBSTAN-
TIAL COMPLETION OF THE CONSTRUCTION PROCESS, AND VERIFY
FURNACE OPERATING CONDITIONS INCLUDING IGNITION, INPUT RATE,
TEMPERATURE RISE AND VENTING ACCORDING TO THE INSTRUC-
TIONS.
WARNING
!
Содержание B180CL25E
Страница 48: ...48 FIGURE 33 RKNL B SERIES B 241 MODELS 00 90 42517 56 10 5 18 PCB PRESSURE CONTROL BOARD RKNL B241 ...
Страница 50: ...50 FIGURE 35 RKNL C SERIES 208V 208V 208V 208V 04 ...
Страница 54: ...54 FIGURE 39 RKNL H SERIES 208V 208V 208V 208V 01 ADDED RED 208V LEAD TO IDM S VYM Y 0655S251 04 04 18 01 ...
Страница 60: ...60 97B0055N24 97B0055N24 CM 0418 ...