10
Figure 3-5.
Frame Assembly Plumb & Squaring Table
3.5
PLATFORM REEVING AND ADJUSTMENT
1.
Position the platform near the bottom end of its lifting range. Ensure the platform is level.
2.
Refer to Figure 3-6.
The platform load and spreader tubes are already reeved. Fasten the cable end loops to the lower
tube provided on each of the frame sides.
Содержание VL1250
Страница 28: ...24 Figure 7 1 Platform Assembly ...
Страница 29: ...25 Figure 7 2 Complete Lift Assembly ...