4.1 

Configuration 

Requirements

Depending on the length and size of the heater, the heat exchanger sections 

may  be  installed  in  various  configurations.  Optional  “L”-shaped,  5-foot,  and 

“U”-shaped heat exchanger tubes are available to adapt the heaters to these 

configurations (Option UC2 for “L”; Option UB3 for “U”; Option UA1 for 5-foot 

heat exchanger tube). 
Model VR/GVR heaters may be installed in the configuration lengths shown 

in the table on page 7. Only straight tubes are used to identify length. The 

combustion chamber is always the first 10 ft (3.1M) length. The straight heat 

exchanger tubes represent each additional 10-ft (3.1M) or 5-ft (1.5M) 

Comply with the requirements listed below and the lengths in the table.

•  Sizes 100 and 125 require

 15 ft (4.6M) of straight tube length before installing an 

optional “U” or an “L” tube. 

•  Size 150 requires

 20 ft (6.1M) of straight tube length before installing an optional 

“U”, “L”, or 5-ft (1.5M) tube. 

•  Sizes 175 and 200 require 

30 ft (9.1M) of straight tube length before installing an 

optional “U”, “L”, or 5-ft (1.5M) tube. 

•  Maximum of one “U” tube per system (do not use with “L” tubes).

•  Maximum of two “L” tubes per system (do not use with “U” tube)

•  Maximum of two 5-ft (1.5M) tubes; 5-ft tubes may be used in a layout with a “U” or 

“L” tube

•  On a “U” configuration, the straight tube length on the burner side of the “U” must 

be equal to or longer than the tube length on the exhaust side. 

•  Exhaust tube must always be a 10-ft (3M) tube.

4. Configurations, Dimensions, and Clearances

FIGURE 1 - Tube 

Cartons include 

Tubes, Reflectors, 

Hangers, Brackets, 

Couplings, and 

Hardware

Important NOTE:

 Before 

installation, wipe any 

excess corrosion inhibitor 

from the heat exchanger 

tubes. Failure to do so 

could result in excessive 

smoke from the surface 

of the tubes on first 

startup.

3. Uncrating/

Packaging 

(cont’d)

CK11) and/or a turnbuckle kit (Option CK12-18) or field-supplied hardware. See sus

-

pension requirements in Paragraph 5.) 

 

Accessory Cartons

 - All field-installed options are shipped in separate car

-

Packaging Scheme for 10’ Straight Tubes

Pkg ID* Pkg P/N

Contents

VRE

205204

(1) Combustion Chamber Tube; (1) Heat Exchanger Tube 

VRF

205205

(1) Combustion Chamber Tube; (2) Heat Exchanger Tubes 

VRG

205206

(2) Heat Exchanger Tubes 

VRH

205151

(3) Heat Exchanger Tubes 

Tube Packages Required by Length of System  Each tube package includes 

required hardware for tubes and 

reflectors

. Extra hardware packages 

are available as parts. 

Length

Qty

Pkg P/N

Qty

Pkg P/N

20 ft system requires

1 205204 --

--

30 ft system requires

1 205205 --

--

Pkg ID Pkg P/N

Hardware Pkg

40 ft system requires

1 205204 1

205206

VRE

205204

P/N 209401

50 ft system requires

1 205204 1

205151

VRF

205205

P/N 209402

60 ft system requires

1 205205 1

205151

VRG

205206

P/N 209403

70 ft system requires

1 205205 2

205206

VRH

205151

P/N 209404

tons. Be sure all parts are at the installation site.

WARNING: Do not 

install a heater in a 

length or configu

-

ration that is not 

permissible for the 

Size. See Hazard 

Levels, page 2.

Refer to Form T-VR-

CNFG (available from 

your distributor), for a lay

-

out view of all allowable 

configurations.

*

Tube Package ID is the 

same for Model VR and 

Model GVR heaters.

Содержание GVR 100

Страница 1: ...ead and understand the installation operation and service instructions in this manual Improper installation adjustment alteration service or maintenance can cause serious injury death or property dama...

Страница 2: ...tion DE2 Combustion Air Inlet Kit must be used There are warning labels on the unit and throughout this manual For your safety read the definitions below and comply with all boxes labeled CAUTION WARN...

Страница 3: ...M to the bottom of the heater from the highest surface of the wings or engine enclosures of the highest aircraft which may be housed in the hangar NFPA 409 and CAN CSA B149 1 specify a minimum clearan...

Страница 4: ...more comfortable temperature than with convection warm air heating equipment For optimum comfort when infrared heaters are being used to heat personnel spot heating it is recommended that 1 the rays...

Страница 5: ...TUH heater Conversion kit to change to a Size 100 000 BTUH heater VR 125 150 Factory assembled Size 125 000 BTUH heater Conversion kit to change to a Size 150 000 BTUH heater VR175 200 Factory assembl...

Страница 6: ...ations Dimensions and Clearances FIGURE 1 Tube Cartons include Tubes Reflectors Hangers Brackets Couplings and Hardware Important NOTE Before installation wipe any excess corrosion inhibitor from the...

Страница 7: ...ze and Configuration meters 50 6 1 9 1 12 2 6 1 9 1 12 2 6 1 9 1 12 2 7 6 10 7 7 6 9 1 10 7 12 2 75 6 1 9 1 12 2 6 1 9 1 12 2 6 1 9 1 12 2 7 6 10 7 7 6 9 1 10 7 12 2 100 9 1 12 2 15 2 9 1 12 2 15 2 12...

Страница 8: ...tibles Size Below Top Horizontal Clearances Vent Burner End Heat Exchanger Bend U or L Exhaust End 50 75 100 inches 66 12 24 36 24 6 mm 1676 305 610 914 610 152 125 150 inches 78 12 30 48 24 6 mm 1981...

Страница 9: ...ly are the responsibility of the installer Follow all instructions carefully All burner control boxes require some field preparation The type of preparation depends on how the unit was ordered and whe...

Страница 10: ...Only On a Size 200 change the pressure switch Instructions for Changing Pressure Switch a In the control compartment locate the pressure switch See FIGURE 5 b Mark and disconnect the two wires attach...

Страница 11: ...0 0 25 0 30 Label Color Gray Pink Green 6 2 Assemble and Suspend the Heater 6 2 1 Assemble the Burner Control Box and the Combustion Chamber Tube Use these parts from the hardware bag to assemble the...

Страница 12: ...ion is going to be horizontal and a turnbuckle has been used close the S hooks If the reflector is going to be angled or there is no turn buckle leave the S hooks open until after the system is levele...

Страница 13: ...raight Heat Exchanger Tube 10 ft 3M or 5 ft 1 5M Option UA1 L Heat Exchanger Tube Option UC2 U Heat Exchanger Tube Option UB3 FIGURE 13C Tube Coupling with Tighten ing Bolts and Two Self drilling Scre...

Страница 14: ...elf Drilling Screws With both tube ends as far into the coupling as they will go tighten the coupling bolts In the top insert the two self drilling screws to secure the coupling to each tube Use the s...

Страница 15: ...acent to the exhaust heat exchanger tube See FIGURE 17B 5 5 2 sections before U or L is connected Into end of straight tube before U or L 3 sections after exhaust heat exchanger tube is connected Into...

Страница 16: ...are shipped with the tubes Clips and screws for length of system are included in the tube package hardware bag FIGURE 18 Reflector for Straight Tubes Parts Tools Needed Clips and screws from the tube...

Страница 17: ...nges FIGURE 19B To allow for reflector expansion the clip must have a minimum of 1 1 4 32mm clearance from a tube bracket between the clip and the burner box Position each clip drill 1 8 hole and inse...

Страница 18: ...ed to fit the installation 6 Mechanical cont d 6 2 Assemble and Suspend the Heater cont d 6 2 4 Install Reflectors and Optional Side Shield and or End Covers cont d Straight Tube Reflector Installatio...

Страница 19: ...needed At that location install one of the wire reflec tor retainers and a tube bracket supplied with the side shield NOTE Sus pension is not required at any of the additional wire reflector retainer...

Страница 20: ...tubes should be at right angles and U shaped systems should be parallel 6 Mechanical cont d 6 2 4 Install Reflectors and Optional Side Shield and or End Covers cont d 6 2 Assemble and Suspend the Hea...

Страница 21: ...30 79 275 168 410 250 780 476 150 31 19 64 39 120 73 250 153 380 232 710 433 175 28 17 59 36 110 67 225 137 350 214 650 397 200 26 16 55 34 100 61 210 128 320 195 610 372 Note When sizing supply lines...

Страница 22: ...ntaining calibration of a spring type gauge 2 Open the valve and operate the heater Measure the outlet gas pressure Adjustment to the factory preset regulator is rarely necessary Valve Outlet Pressure...

Страница 23: ...for natural gas is between 4 5 and 14 w c for Sizes 50 150 and between 6 Derate is by Valve Outlet Pressure Adjustment for High Altitude Operation This adjustment can only be done after the heater is...

Страница 24: ...000 150000 175000 200000 2001 4500 611 1373 45000 67500 90000 112500 135000 157500 180000 6 4 Venting and Combustion Air Venting must be in accordance with the National Fuel Gas Code NFPA 54 ANSI Z223...

Страница 25: ...ertical use at least two non corrosive screws per vent pipe joint on single wall pipe or follow the pipe manufacturer s instructions for joining double wall pipe When attaching double wall pipe to sin...

Страница 26: ...pipe is used in the vent terminal follow the instructions in the Addendum page 45 to attach the vent cap and to connect the double wall pipe to the single wall vent pipe NOTE For optional vent termin...

Страница 27: ...ion SINGLE WALL Single wall vent run and single wall terminal end DOUBLE WALL Single wall vent run and double wall terminal end Horizontal Vent Clearance Table Structure Minimum Clearances for Vent Te...

Страница 28: ...ent Terminal Air Intake Arrangements drawings are not proportional read all information SINGLE WALL Single wall vent run and single wall terminal end DOUBLE WALL Single wall vent run and double wall t...

Страница 29: ...ane gas per hour input of installed heaters Exhaust openings for removing flue products shall be above the level of the heater When mechanical means is provided to supply and exhaust a positive inter...

Страница 30: ...mosphere is dirt laden 3 the atmosphere contains any substance that will cause toxic gas when passed through a flame or 4 the heater is installed in a tightly closed room that does not provide require...

Страница 31: ...for each opening See 1 in FIGURE 30 2 Air from outside through duct openings 1 square inch free area per 2000 BTUH See 2 in FIGURE 30 3 Air direct from outside openings 1 square inch free area per 400...

Страница 32: ...115 208 230 1 60 220 240 1 50 CAPACITOR SEE NOTE 6 BR BR SPARK TRANSFORMER WIRING CODE BLACK BK BROWN BR RED R ORANGE O YELLOW Y GREEN G BLUE BL PURPLE PR WHITE W Y W1 R SET ANT AT 0 6 AMPS R W R 1C30...

Страница 33: ...eater If required was the manifold pressure adjusted for high altitude Sizes 50 175 was a high altitude pressure switch installed See Paragraphs 6 1 and 6 3 If required was a size conversion kit insta...

Страница 34: ...R PER 1000 BTUH S FOR NATURAL GAS OR 5 CFM OF FRESH AIR PER 1000 BTUH S FOR PROPANE 8 Check Installation and Start Up cont d With the unit operating measure manifold gas pressure See Paragraph 6 3 Tur...

Страница 35: ...ch completed heating cycle Carefully inspect the flexible gas con nector for any evidence that a fatigue crack has developed or is developing If the inspection indicates that replacement is needed rep...

Страница 36: ...e main burner This buildup of dirt will eventually affect the operation of the heater To maintain safe and reliable heater operation an annual cleaning more frequently in dirty environments is recomme...

Страница 37: ...and inside the concentric port rings on the main burner could cause fuel gas to spill out of the back of the burner tube Fuel gas spilling out of the back of the burner tube will cause gas odor inside...

Страница 38: ...1 Turn off or disconnect the main electric supply 2 Open the control access panel Rotate the knob on the gas valve to the OFF position At the ignition controller disconnect the high voltage spark elec...

Страница 39: ...10 1 Control Location Operation and Service WARNING Service work on this heater should only be done by a qualified gas service person This service information and the troubleshooting guides are intend...

Страница 40: ...negative building pressure When negative building pressure exists install an outside combustion air inlet An obstruction in the vent pipe or combustion air inlet Remove obstruction A dirty combustion...

Страница 41: ...r FIGURE 43 Transformer Function The function of the transformer is to reduce the supply voltage to a 24 volt circuit in order to operate the 24 volt controls Transformer Check requires a voltmeter To...

Страница 42: ...ine 2 Bleed gas line initial startup only 3 Gas pressure too high or too low 3 See Gas Supply Pressure Table Paragraph 6 3 4 No Spark 4 a Loose wire connections a Be certain all wire connections are s...

Страница 43: ...ions 2 Defective DSI control board 2 Replace board 3 Defective motor 3 Replace motor Blower motor turns on and off while burner is operating 1 Motor overload device cycling on and off 1 Check motor lo...

Страница 44: ...PEN FIGURE 46 Pressure Switch Troubleshooting Guide Is the gas supply turned on Is the gas supply pressure correct Refer to Paragraph 6 3 Is the main electrical supply on Is the correct voltage being...

Страница 45: ...E 48 STEP 1 Place a continual 3 8 bead of silicone sealant around the circumference of the vent cap col lar This will prevent any water inside the vent cap from running down the double wall pipe Do ST...

Страница 46: ...ressure Minimum Maximum 50 000 150 000 Natural Gas 4 5 w c 14 w c 175 000 200 000 6 w c 14 w c 50 000 200 000 Propane 11 w c 14 w c BTUH Input Minimum Length Maximum Length 50 000 20 feet 6 1M 40 feet...

Страница 47: ...at Connections 32 Transformer 39 41 Troubleshooting 42 Troubleshooting Guide 44 Tube Bracket 12 13 Tube Coupling 13 Tube Packages 6 Turbulator Requirements 15 Turbulator Strip 13 14 Turbulator Strip S...

Страница 48: ...____________________________ ________________________________________________________ Phone _________________________________ Model No ______________ Serial No _____________________Date of Installatio...

Отзывы: