DANGER:  The  fresh  air  requirement  of  4  CFM  per  1000  BTUH 

for natural gas and 5 CFM per 1000 BTUH for propane gas is 

mandatory when operating a heater in the unvented mode. See 

Hazard Levels, page 2. 

• 

Do not

 operate in the unvented mode if there is any doubt about the qual

-

ity of the insulation in the building. Unvented operation in a building that 

has an uninsulated roof or that may have uninsulated structural members 

partially exposed to the outdoors may result in condensation. The conden

-

sation may be severe enough to drip and/or cause corrosion.

• 

Do not 

install in the unvented mode with outside combustion air unless the 

inlet air cap is at or below the plane of the heater.

When installing a heater in the unvented mode, a vent cap must be used and 

must be inverted as illustrated in 

FIGURE 29

. Install the elbow as shown in 

FIG-

URE 25

 but in addition to securing the elbow with one screw on the top, secure 

it to the compression coupling using two additional non-corrosive sheetmetal 

screws with all three screws spaced approximately 120° apart. Attach the vent 

cap to the 90° elbow in the same manner with three sheetmetal screws.
When  a  heater  is  operated  without  being  vented  to  the  outdoors, 

the TOP 

clearance to combustibles is 18” (457mm); see Paragraph 4.3. 

The burner is equipped with a centrifugal blower to provide combustion air. The 

air for combustion can come either from the heated space or be piped directly 

from the outside. Combustion air should be piped from the outside if (1) the 

pressure in the building is negative, (2) the atmosphere is dirt laden, (3) the 

atmosphere  contains  any  substance  that  will  cause  toxic  gas  when  passed 

through a flame, or (4) the heater is installed in a tightly closed room that does 

not provide required air for combustion.

If drawing combustion air from the heated space,

 the screened combus

-

tion air opening on the burner box must be kept clean. Maintain a minimum 12” 

clearance from the combustion air inlet opening. If the heater is located in a 

tightly closed room and is not equipped with a combustion air inlet pipe, provi

-

sion must be made to supply air for combustion to the room. 
The requirements for combustion and ventilation air depend upon whether the 

unit is located in a confined or unconfined space. An “unconfined” space is 

defined as a space whose volume is not less than 50 cubic feet per 1000 BTUH 

of the aggregate input rating of all appliances installed in that space. Under all 

conditions, enough air must be provided to ensure there will not be a negative 

pressure condition within the equipment room or space. 

Do not install a unit in a confined space without providing wall openings lead

-

ing to and from this space. Provide adequate openings near floor and ceiling 

for ventilation and air for combustion, as shown in 

FIGURE 30

, depending on 

combustion air source as noted below.

6.4.4 Combustion Air

FIGURE 30 - 

Combustion Air 

and Ventilation 

Requirements for a 

Confined Space

Confined Space: A space whose 

volume is less than 50 cubic feet 

per 1000 BTUH of the aggregate 

input rating of all appliances 

installed in that space.

6.4 Venting and 

Combustion Air 

(cont’d)

6. Mechanical 

(cont’d)

Add total BTUH of all appliances in the confined space and divide by figures 

below for square inch free area size of each (top and bottom) opening.

6.4.3 Unvented Installation (cont’d)

Содержание GVR 100

Страница 1: ...ead and understand the installation operation and service instructions in this manual Improper installation adjustment alteration service or maintenance can cause serious injury death or property dama...

Страница 2: ...tion DE2 Combustion Air Inlet Kit must be used There are warning labels on the unit and throughout this manual For your safety read the definitions below and comply with all boxes labeled CAUTION WARN...

Страница 3: ...M to the bottom of the heater from the highest surface of the wings or engine enclosures of the highest aircraft which may be housed in the hangar NFPA 409 and CAN CSA B149 1 specify a minimum clearan...

Страница 4: ...more comfortable temperature than with convection warm air heating equipment For optimum comfort when infrared heaters are being used to heat personnel spot heating it is recommended that 1 the rays...

Страница 5: ...TUH heater Conversion kit to change to a Size 100 000 BTUH heater VR 125 150 Factory assembled Size 125 000 BTUH heater Conversion kit to change to a Size 150 000 BTUH heater VR175 200 Factory assembl...

Страница 6: ...ations Dimensions and Clearances FIGURE 1 Tube Cartons include Tubes Reflectors Hangers Brackets Couplings and Hardware Important NOTE Before installation wipe any excess corrosion inhibitor from the...

Страница 7: ...ze and Configuration meters 50 6 1 9 1 12 2 6 1 9 1 12 2 6 1 9 1 12 2 7 6 10 7 7 6 9 1 10 7 12 2 75 6 1 9 1 12 2 6 1 9 1 12 2 6 1 9 1 12 2 7 6 10 7 7 6 9 1 10 7 12 2 100 9 1 12 2 15 2 9 1 12 2 15 2 12...

Страница 8: ...tibles Size Below Top Horizontal Clearances Vent Burner End Heat Exchanger Bend U or L Exhaust End 50 75 100 inches 66 12 24 36 24 6 mm 1676 305 610 914 610 152 125 150 inches 78 12 30 48 24 6 mm 1981...

Страница 9: ...ly are the responsibility of the installer Follow all instructions carefully All burner control boxes require some field preparation The type of preparation depends on how the unit was ordered and whe...

Страница 10: ...Only On a Size 200 change the pressure switch Instructions for Changing Pressure Switch a In the control compartment locate the pressure switch See FIGURE 5 b Mark and disconnect the two wires attach...

Страница 11: ...0 0 25 0 30 Label Color Gray Pink Green 6 2 Assemble and Suspend the Heater 6 2 1 Assemble the Burner Control Box and the Combustion Chamber Tube Use these parts from the hardware bag to assemble the...

Страница 12: ...ion is going to be horizontal and a turnbuckle has been used close the S hooks If the reflector is going to be angled or there is no turn buckle leave the S hooks open until after the system is levele...

Страница 13: ...raight Heat Exchanger Tube 10 ft 3M or 5 ft 1 5M Option UA1 L Heat Exchanger Tube Option UC2 U Heat Exchanger Tube Option UB3 FIGURE 13C Tube Coupling with Tighten ing Bolts and Two Self drilling Scre...

Страница 14: ...elf Drilling Screws With both tube ends as far into the coupling as they will go tighten the coupling bolts In the top insert the two self drilling screws to secure the coupling to each tube Use the s...

Страница 15: ...acent to the exhaust heat exchanger tube See FIGURE 17B 5 5 2 sections before U or L is connected Into end of straight tube before U or L 3 sections after exhaust heat exchanger tube is connected Into...

Страница 16: ...are shipped with the tubes Clips and screws for length of system are included in the tube package hardware bag FIGURE 18 Reflector for Straight Tubes Parts Tools Needed Clips and screws from the tube...

Страница 17: ...nges FIGURE 19B To allow for reflector expansion the clip must have a minimum of 1 1 4 32mm clearance from a tube bracket between the clip and the burner box Position each clip drill 1 8 hole and inse...

Страница 18: ...ed to fit the installation 6 Mechanical cont d 6 2 Assemble and Suspend the Heater cont d 6 2 4 Install Reflectors and Optional Side Shield and or End Covers cont d Straight Tube Reflector Installatio...

Страница 19: ...needed At that location install one of the wire reflec tor retainers and a tube bracket supplied with the side shield NOTE Sus pension is not required at any of the additional wire reflector retainer...

Страница 20: ...tubes should be at right angles and U shaped systems should be parallel 6 Mechanical cont d 6 2 4 Install Reflectors and Optional Side Shield and or End Covers cont d 6 2 Assemble and Suspend the Hea...

Страница 21: ...30 79 275 168 410 250 780 476 150 31 19 64 39 120 73 250 153 380 232 710 433 175 28 17 59 36 110 67 225 137 350 214 650 397 200 26 16 55 34 100 61 210 128 320 195 610 372 Note When sizing supply lines...

Страница 22: ...ntaining calibration of a spring type gauge 2 Open the valve and operate the heater Measure the outlet gas pressure Adjustment to the factory preset regulator is rarely necessary Valve Outlet Pressure...

Страница 23: ...for natural gas is between 4 5 and 14 w c for Sizes 50 150 and between 6 Derate is by Valve Outlet Pressure Adjustment for High Altitude Operation This adjustment can only be done after the heater is...

Страница 24: ...000 150000 175000 200000 2001 4500 611 1373 45000 67500 90000 112500 135000 157500 180000 6 4 Venting and Combustion Air Venting must be in accordance with the National Fuel Gas Code NFPA 54 ANSI Z223...

Страница 25: ...ertical use at least two non corrosive screws per vent pipe joint on single wall pipe or follow the pipe manufacturer s instructions for joining double wall pipe When attaching double wall pipe to sin...

Страница 26: ...pipe is used in the vent terminal follow the instructions in the Addendum page 45 to attach the vent cap and to connect the double wall pipe to the single wall vent pipe NOTE For optional vent termin...

Страница 27: ...ion SINGLE WALL Single wall vent run and single wall terminal end DOUBLE WALL Single wall vent run and double wall terminal end Horizontal Vent Clearance Table Structure Minimum Clearances for Vent Te...

Страница 28: ...ent Terminal Air Intake Arrangements drawings are not proportional read all information SINGLE WALL Single wall vent run and single wall terminal end DOUBLE WALL Single wall vent run and double wall t...

Страница 29: ...ane gas per hour input of installed heaters Exhaust openings for removing flue products shall be above the level of the heater When mechanical means is provided to supply and exhaust a positive inter...

Страница 30: ...mosphere is dirt laden 3 the atmosphere contains any substance that will cause toxic gas when passed through a flame or 4 the heater is installed in a tightly closed room that does not provide require...

Страница 31: ...for each opening See 1 in FIGURE 30 2 Air from outside through duct openings 1 square inch free area per 2000 BTUH See 2 in FIGURE 30 3 Air direct from outside openings 1 square inch free area per 400...

Страница 32: ...115 208 230 1 60 220 240 1 50 CAPACITOR SEE NOTE 6 BR BR SPARK TRANSFORMER WIRING CODE BLACK BK BROWN BR RED R ORANGE O YELLOW Y GREEN G BLUE BL PURPLE PR WHITE W Y W1 R SET ANT AT 0 6 AMPS R W R 1C30...

Страница 33: ...eater If required was the manifold pressure adjusted for high altitude Sizes 50 175 was a high altitude pressure switch installed See Paragraphs 6 1 and 6 3 If required was a size conversion kit insta...

Страница 34: ...R PER 1000 BTUH S FOR NATURAL GAS OR 5 CFM OF FRESH AIR PER 1000 BTUH S FOR PROPANE 8 Check Installation and Start Up cont d With the unit operating measure manifold gas pressure See Paragraph 6 3 Tur...

Страница 35: ...ch completed heating cycle Carefully inspect the flexible gas con nector for any evidence that a fatigue crack has developed or is developing If the inspection indicates that replacement is needed rep...

Страница 36: ...e main burner This buildup of dirt will eventually affect the operation of the heater To maintain safe and reliable heater operation an annual cleaning more frequently in dirty environments is recomme...

Страница 37: ...and inside the concentric port rings on the main burner could cause fuel gas to spill out of the back of the burner tube Fuel gas spilling out of the back of the burner tube will cause gas odor inside...

Страница 38: ...1 Turn off or disconnect the main electric supply 2 Open the control access panel Rotate the knob on the gas valve to the OFF position At the ignition controller disconnect the high voltage spark elec...

Страница 39: ...10 1 Control Location Operation and Service WARNING Service work on this heater should only be done by a qualified gas service person This service information and the troubleshooting guides are intend...

Страница 40: ...negative building pressure When negative building pressure exists install an outside combustion air inlet An obstruction in the vent pipe or combustion air inlet Remove obstruction A dirty combustion...

Страница 41: ...r FIGURE 43 Transformer Function The function of the transformer is to reduce the supply voltage to a 24 volt circuit in order to operate the 24 volt controls Transformer Check requires a voltmeter To...

Страница 42: ...ine 2 Bleed gas line initial startup only 3 Gas pressure too high or too low 3 See Gas Supply Pressure Table Paragraph 6 3 4 No Spark 4 a Loose wire connections a Be certain all wire connections are s...

Страница 43: ...ions 2 Defective DSI control board 2 Replace board 3 Defective motor 3 Replace motor Blower motor turns on and off while burner is operating 1 Motor overload device cycling on and off 1 Check motor lo...

Страница 44: ...PEN FIGURE 46 Pressure Switch Troubleshooting Guide Is the gas supply turned on Is the gas supply pressure correct Refer to Paragraph 6 3 Is the main electrical supply on Is the correct voltage being...

Страница 45: ...E 48 STEP 1 Place a continual 3 8 bead of silicone sealant around the circumference of the vent cap col lar This will prevent any water inside the vent cap from running down the double wall pipe Do ST...

Страница 46: ...ressure Minimum Maximum 50 000 150 000 Natural Gas 4 5 w c 14 w c 175 000 200 000 6 w c 14 w c 50 000 200 000 Propane 11 w c 14 w c BTUH Input Minimum Length Maximum Length 50 000 20 feet 6 1M 40 feet...

Страница 47: ...at Connections 32 Transformer 39 41 Troubleshooting 42 Troubleshooting Guide 44 Tube Bracket 12 13 Tube Coupling 13 Tube Packages 6 Turbulator Requirements 15 Turbulator Strip 13 14 Turbulator Strip S...

Страница 48: ...____________________________ ________________________________________________________ Phone _________________________________ Model No ______________ Serial No _____________________Date of Installatio...

Отзывы: