Page No 16 Reznor, Guardian GB GR and GS, Installation Manual, EN 2021-08, D301214 Iss D
I
Suspending on threaded rods
1. The product is installed using 4 x M10 threaded
rods fitted into the fixing points in the top of
casing.
2. The threaded rods must completely pass through
the fixing points in the case without being too
long to cause damage to products inside the
case.
3. Ensure that the secure mounting point in the
ceiling is capable of supporting the weight of the
unit.
4. Lift the unit (using lifting equipment) onto
threaded rods ceiling fixing point.
Figure 14 Suspending from threaded rods
5. Level the unit and tighten the fixing points.
Carryout a final check to ensure the unit remains
level
6. Holes are provided in the casing for cable
entry. Choose the appropriate hole to suit the
installation. Note the terminal connection block
is located to the right of the unit.
7. Install the cable into the case using a suitable
cable gland for size of cable
8. Two RJ45 ports are located in the case to
connect the display panel and any other air
curtains to be controlled
9. Adjust outlet to required angle to give desired
performance and tighten outlet grille.
10. Fit the Display panel and commission the unit
Wall mounting bracket
Figure 15 Wall mounting bracket
Figure 15.1 Side view
Figure 15.1 shows the overall dimensions of the wall
bracket assembly.
Figure 15.2 Front view
Figure 15.2 shows the dimensions of the bracket
that is to be fixed to the wall, along with fixing
positions. Please ensure that adequate fixings and
wall structure are present to support the unit weight.
355
25
47
300
82
30
150
120
Ø
11
Ø
11