Page No 14 Reznor, Guardian 1 Phase Electric Heat with Signal Pro, Installation Manual, EN 2021-11, D301375 Iss 0
I
Suspending on drop rods
1. The product is installed using 4 x M10 drop
rods fitted into the fixing points in the top
of casing.
2. The drop rods must completely pass
through the fixing points in the case
without being too long to cause damage
to products inside the case.
3. Ensure that the secure mounting point in
the ceiling is capable of supporting the
weight of the unit.
4. Lift the unit (using lifting equipment) onto
drop rods ceiling fixing point.
Figure 14 Suspending from drop rods
5. Level the unit and tighten the fixing points.
Carryout a final check to ensure the unit
remains level
6. Holes are provided in the casing for cable
entry. Choose the appropriate hole to
suit the installation. Note the terminal
connection block is located to the right of
the unit.
7. Install the cable into the case using a
suitable cable gland for size of cable
8. Two RJ45 ports are located in the case to
connect the program panel and any other
air curtains to be controlled
9. Adjust outlet to required angle to give
desired performance and tighten outlet
grille.
10. Fit the display panel and commission the
unit
Wall mounting bracket
Figure 15 Wall mounting bracket
Figure 15.1 Side view
Figure 15.1 shows the overall dimensions of
the wall bracket assembly.
Figure 15.2 Front view
Figure 15.2 shows the dimensions of the
bracket that is to be fixed to the wall, along
with fixing positions. Please ensure that
adequate fixings and wall structure are present
to support the unit weight.
Содержание GUARDIAN GB 1000