11

OPT-AS3,4,5,8 (07-22) 160202-B

AquaSaver Timed Metering Control System Connections

 

If the cooling module is equipped with a timed metering system, connect a 1/2-inch water line to the fitting on the 

side of the cooling module.

 

Due to various water pressures and installation conditions, the water supply line may bang abruptly when the solenoid 

valve in the AquaSaver system closes. This banging can be minimized by installing a water hammer arrestor in 

the supply line. If installing an optional water hammer arrestor, select an indoor (>32°F) location, either horizontal 

or vertical, in line with and as close to the solenoid valve as possible. Follow the manufacturer’s instructions to 

install and maintain the water hammer arrestor.

 

A freeze protection kit is available for a module with a timed control system. It includes a two-way valve and is 

shipped separately for field-installation.

Shutoff and Drain Connections

 

To allow the water supply to be turned on and off, a manual water shutoff should be installed upstream of the inlet 

at a convenient non-freezing location. If necessary, install a bleed line between the manual valve and the cooling 

module inlet to allow drainage of the line between the shutoff valve and the cooling module.

 

All cooling modules are equipped with an overflow and drain fitting. The fittings are in the cabinet bottom and come 

complete with a locknut and a sealing gasket. Check these fittings for tightness before installing the overflow and 

drain piping. The drain and overflow fitting will accommodate a 3/4-inch garden hose thread and is tapped with a 

1/2-inch female pipe thread for iron pipe.

Bleed Line Connection

NOTE:  Adequate bleed-off is important to maintaining an efficiently-operating evaporative cooling 

system. Discharging a quantity of water by bleed-off will limit undesirable minerals in the water 

from being circulated through the cooling module. Mineral buildup occurs because evaporation 

releases only pure water vapor, which causes the concentration of contaminants in the water to 

increase as the evaporation process continues. The minerals accumulate on the media, in the water 

lines, on the pump, and in the reservoir.

 

Install a bleed line on cooling modules equipped with pump and float controls only—does not apply to modules 

with AquaSaver timed controls.

 

Thread the 1/4 ID × 1/2 NPT nylon bleed line fitting (shipped in the cooling module’s bottom pan) into the female 

adapter on the distribution pipe. The hose barb protrudes from the air inlet side of the module cabinet (see 

Figure 

12

). Connect a 1/4 ID hose to the barb and run to the nearest drain.

Figure 12.  Bleed Line Connection

BLEED LINE 

CONNECTION

Содержание AS3

Страница 1: ...ling modules require outside air TABLE OF CONTENTS GENERAL INFORMATION 1 Dimensions 2 Weights 2 INSTALLATION 3 Pre Installation Checklist 3 Assemble Base 3 Install Evaporative Cooling Module on Base 4...

Страница 2: ...1 Evaporative Cooling Module Installation Components Item No Component PN Quantity Application 1 End rail 107235 2 Base assembly 2 Side rail 107227 2 3 Two piece leg 107236 4 4 Front top cover 107228...

Страница 3: ...drain and fill kit freeze protection kit moisture elimination pads and or water hammer arrestor check to ensure that these parts are available for installation Ensure that there is adequate clearance...

Страница 4: ...odule with both ends supported and place it on base assembly Ensure that module is level and that all base assembly bolts are secure 2 Install top front cover 4 and secure using 13 screws 8 three per...

Страница 5: ...oling module using screws 8 five per side 4 Secure transition duct flange to front top cover 4 using seven screws 8 5 With cooling module and transition duct properly positioned on blower cabinet tigh...

Страница 6: ...ure 6 a Install two catch pad clamps to one side of cooling module s front legs and secure clamps through legs into clamp using four screws 8 b Assemble catch pads together using three screws 8 NOTE T...

Страница 7: ...rection Through Media Pads Pump Junction Box Assembly Installation NOTE To avoid damage during shipping the pump junction box assembly is secured to the top of the side panel 1 Support pump junction b...

Страница 8: ...mp Junction Box Assembly Electrical Connections PUMP JUNCTION BOX ASSEMBLY OPERATING LOCATION Figure 9 Evaporative Cooling Module Factory Installed Wiring BL MODELS WITH 115 230 1 60 OR 230 460 575 3...

Страница 9: ...interfere with damper controls 5 Run wires up to electrical compartment remove plug from one bottom entrance hole and push tubing encased wires into electrical compartment Place other strain relief bu...

Страница 10: ...iddle outlet to supply water to cooling module reservoir b For drain two way valve connections connect drain pipe from reservoir to A and connect outlet side to B and connect into drain lines from coo...

Страница 11: ...dule All cooling modules are equipped with an overflow and drain fitting The fittings are in the cabinet bottom and come complete with a locknut and a sealing gasket Check these fittings for tightness...

Страница 12: ...ailure to do so can cause electrical shock personal injury or death CAUTION Do not flood the media pads with extreme quantities of water for long periods as this will cause premature breakdown of the...

Страница 13: ...iven temperature the media pads should completely wet from top to bottom dur ing the ON cycle The AquaSaver microprocessor has three preset timing settings based on media size The appropriate setting...

Страница 14: ...on Remove the water feed line from the downstream side of the ball valve and unscrew the water bleed line barbed hose fitting Force a fresh water supply up through the water inlet hose and thoroughly...

Страница 15: ...ow section 2 Dirty media pads Clean or replace media pads refer to Installation Replacement of Media Pads section D Water not distributing evenly 1 Distribution line clogged Flush distribution line re...

Страница 16: ...ustrations subject to change without notice or incurring obligations Latest version of this manual is available at www reznorhvac com 2022 Nortek Global HVAC LLC O Fallon MO All rights reserved OPT AS...

Отзывы: