Reynolds Building Systems the Richmond Скачать руководство пользователя страница 17

2-1/2" Screw

2x6 Soffit

Block

1x3 Board

2x6 Truss

Plate

2x6 Truss Plate

2.

Secure trusses to 2x6 truss plates with 2x6

metal hangers. Nail metal hanger to truss
plate and trusses with hanger nails.

1.

Install 2x6 trusses, over the 'X' marks, on the truss plate. Toenail the truss to plate, flush

with the outside edge of the 2x6 truss plate. Use 7d sinker. Remove and use lower 2x4
wall bracing to brace the trusses.

2x4 Metal

Hanger

Step 15 Install Soffit Overhang on Sidewalls

1.

Extend the lines on the face of the 2x6

to the edge of the 2x6.

2.

Install 1x3-8' boards on the sidewall.

Use a 2x6 soffit block as a gauge to
install the 1x3 at the correct height.
Nail the 1x3 boards to each wall stud
with one 10d nail. When installed, the
soffit blocks must be set directly below
the trusses.

3.

Position the 2x6 soffit blocks between the 1x3 board

and the 2x6 truss plate. Secure the top of the soffit
blocks in place by screwing through the 2x6 truss

plate into the soffit block. Secure the bottom by toe-
nailing through the bottom of the 2x6 soffit block
into the 1x3 board. Use 7d coated nails. Install the

soffit overhang on the opposite side of the building.

Step 16 Set Trusses

2x4 Bracing

Nail 1x3 Board to Wall Studs

Screw A Soffit Block (with siding attached)

to Overhang

Содержание the Richmond

Страница 1: ...stems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Build...

Страница 2: ...in your area for foundation requirements IMPORTANT Unpack the material from our pallet then carefully disassemble the pallet The 2x4s will be used for bracing The OSB panels for roof sheathing The pa...

Страница 3: ...e corner The measurements will be the same if the wall is square LAP Edge Install Siding Flush Treated Bottom Plate 92 5 8 Precut Wall Studs Do Not Nail LAP Edge Top Wall Plate Treated Bottom Plate 16...

Страница 4: ...1 one to 15 5 5 Assemble the front wall panel using the wall plates cut above and pre cut wall studs 6 Install the 2x8 header Note The bottom 2x4 will be removed from the door opening after the walls...

Страница 5: ...l stud 9 Install more 4x8 siding panels 10 Cut siding from door opening 5 8 OSB Filler 1 Cut 2 two pre cut wall studs to a length of 83 3 4 83 3 8 if using western wall studs Nail one of the 2x4s to a...

Страница 6: ...the wall frame Step 4 Build 8 Sidewalls 1 Note When building the lower walls use treated wood for the bottom wall plate Cut 2 two 2x4 8 boards one will be treated to a length of 92 1 2 Position the b...

Страница 7: ...ates assemble another wall panel using precut wall studs 4 Position this frame next to the 91 wall panel Do Not nail frames together Square the wall frame Install a siding panel Do Not nail the LAP ed...

Страница 8: ...osition wall frame with the 11 3 4 stud space on the right side 3 Install the 1st siding panel with the CUT edge extending 3 1 2 beyond the right side of the frame LAP Edge 4 Repeat Step 5 to assemble...

Страница 9: ...sidewall panel 3 Brace sidewalls using 90 long 2x4s pallet material 4 Cut a 2x4 16 to a length of 15 5 and install across the top of the back wall The 2x4 will set in 3 1 2 from each end of the back...

Страница 10: ...w 3 Position 2x8 blocks leftover from door header at the top of the 2x8 and beam Important The hangers should line up across from each other Install metal joist hangers on both 2x8 s and beam Install...

Страница 11: ...to the stair instructions to install the floor joist at the rear of the building 2 Install the 2x8 boards from Step 8 on the front and back walls flush with the top of the tie plates Secure the 2x8s...

Страница 12: ...building Step 11 Assemble Rear Roof Gable 2 The 2x4 wall studs in the bottom wall frame are screwed to the outside 2x4s If you are installing a window or loft door remove the screws and move the 2x4s...

Страница 13: ...gable panels numbered 9 and 10 Remove the siding from these panels The siding panels are tacked to the walls with a few nails 2x4 Block 4 Position gable walls numbers 6 and 7 on the floor with the sid...

Страница 14: ...loft area Install 82 1 4 long 2x4s at the top of the gable The 2x4s have a blue mark on one end Install this end at the peak Install the 2x4s so they extend 1 2 above the gable frame to receive the ro...

Страница 15: ...e 2x4 blocks at the knee have a blue mark on the end Install this end towards the ridge Hold blocks in place with 7d sinkers until the gussets are installed 3 Secure the 2x6 boards together using pre...

Страница 16: ...nails 3 Install 2x6 plates 92 from the center of the building When installed properly the 2x6 will project 1 1 2 past the 2x4 tie plate See detail below Nail to floor with 16d nails 1 Install front a...

Страница 17: ...2x6 2 Install 1x3 8 boards on the sidewall Use a 2x6 soffit block as a gauge to install the 1x3 at the correct height Nail the 1x3 boards to each wall stud with one 10d nail When installed the soffit...

Страница 18: ...lip between each truss on the top row of sheathing 96 Long 51 Long 37 3 8 x 72 37 3 8 x 75 48 x 75 Cut Sheathing From Pallet Install 7 16 OSB roof sheathing according to the layout below Install roof...

Страница 19: ...sides of the gable overhangs Step 19 Install Gable Trim Step 18 Install 1x6 Eave Soffit 1 Install 1x6 white pine boards under the 2x6 eave overhang You can install soffit vents for added ventilation 2...

Страница 20: ...Joist 10 lbs 16d Sinkers 2 2 x 8 16 Joist Header 10 lbs 8d Galv siding trim nails 2 LVL Beams 5 lbs 8d Galv sprial loft flooring nails 5 1 x 3 8 White Pine Trim 5 lbs 7d Sinkers roof sheathing 10 1 x...

Отзывы: