![Reynolds Building Systems Best Barns Deluxe Woodville Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/reynolds-building-systems/best-barns-deluxe-woodville/best-barns-deluxe-woodville_assembly-book_1449721006.webp)
Siding Extends
3/4" Below Plate
Step 3
Assemble Front Gable
1.
Assemble another gable frame. Install a 36" long 2x4 between the wall
studs. If installing operating loft doors, install the 36" long 2x4 between
the gable studs where shown below.
36" Long 2x4
34-1/4" Long
Gable Stud
3.
Cut siding from the loft door opening, flush with the edge of the opening.
24-3/4"
If you don't need loft access from the outside, attach loft door frames to
the gable to create a decorative look and weather tight storage area.
2.
Turn the gable over. Install the siding extending 3/4" below the bottom 2x4.