12
Â
Step 5: Connect the operating button or the cable to the building
management system with the black connector (A).
•
If the operating button has an LED, connect the LED with the white
connector (B).
•
In the case of a building management system, the other end of the cable
(C) must be connected with a normally open relay contact.
Â
Step 6: Switch on the 24 VDC power supply.
The red LED 602 flashes. This indicates that the controller is working but has
not yet been configured.
3.1.2. CONFIGURATION
Â
Step 1: Set the type of window using the DIP switches.
•
The red LED 602 (LED-E on image page 6) flashes
•
The types of window can be found on the website or with the motor.
Â
Step 2: Close all vents before continuing with the set-up.
3.1.3. MANUAL SET-UP
•
Manual set-up uses the DIP switches and the SET-UP button.
•
You can exit the procedure at any time by pressing the SET-UP button
for at least 5 seconds until the yellow LED 601 (LED-D on image page
6) flashes.
Содержание 062.8620
Страница 24: ...24 For more information visit http setup ec reynaers com NOTES...
Страница 25: ...English Nederlands Fran ais Deutsch 25 NOTES...
Страница 44: ...44 Voor meer informatie surf naar http setup ec reynaers com OPMERKINGEN...
Страница 45: ...English Nederlands Fran ais Deutsch 45 OPMERKINGEN...
Страница 64: ...64 Pour plus d informations consultez http setup ec reynaers com NOTES...
Страница 65: ...English Nederlands Fran ais Deutsch 65 NOTES...
Страница 84: ...84 F r weitere Informationen besuchen Sie bitte http setup ec reynaers com HINWEISE...
Страница 85: ...English Nederlands Fran ais Deutsch 85 HINWEISE...