
MAN-000037-00 REV C
19
•
Remove the 8 screws securing the Charger to the pallet: (Figure 6)
Figure 6: RV16 Shipping Screw Removal
•
Using a hoist, forklift, or other appropriate lifting equipment, attach a chain or strap
to the lifting eyes at the top of the charger and pick it up off the pallet. Position the
Charger on the installation location and fasten the charger permanently.
Figure 7: RV16 Lifting
Once the Charger has been permanently mounted, the Shipping Spacer can be removed,
and electrical installation can be completed.
Continue on page 25 for Charger Electrical Installation
Содержание RV16
Страница 1: ...MAN 000037 00 REV C RV16 and RV24 Models Installation Operation Manual ...
Страница 55: ...MAN 000037 00 REV C 54 RV24 Models Recommended mounting hardware 5 16 ...
Страница 56: ...MAN 000037 00 REV C 55 Appendix B Post Stand Dimensions and Assembly instructions RV16 Models ...
Страница 57: ...MAN 000037 00 REV C 56 RV24 Models ...
Страница 58: ...MAN 000037 00 REV C 57 ...