
3
Frame Assembly Instructions
IMPORTANT UNPACKING
INSTRUCTIONS
To avoid damage to the power
base, always open the carton
while the power base is laying in
the FLAT position on the floor.
OPEN FLAT
STEP 9
NOTE: An electrical surge
protection unit is recommended
(not included)
Power base assembly is now
complete.
STEP 8
Insert the mattress retainer bar into
the two mount holes located at the
foot end of the power base.
Package contents:
Remote Control
Mattress Retainer Bar
Base Legs
(optional)
STEP 3
STEP 6
STEP 5
WARNING: POWER CORDS
MUST NOT INTERFERE
WITH ANY POWER BASE
MECHANISMS.
WARNING: PINCH POINT! DO
NOT HOLD THE METAL FRAME
FROM UNDERNEATH WHEN
PUTTING ON A FLAT SURFACE
WITHOUT LEGS - INSTEAD, USE
THE HANDLES.
STEP 7
Carefully use the handles on both
sides to lift and place the base on
the floor, platform bed, or in the bed
frame.
STEP 4
ATTENTION!
Improper handling
DO NOT
lean the power
base against the
installed legs to
flip it over.
Carefully flip the base with 2 people
using the handles provided on each
side of the power base.
Plug the power cord into a grounded
electrical outlet.
WARNING: Remove the yellow
packaging bands from under the
frame before attempting to operate
the bed.
Remove the zip ties securing the
excess cord from the motors of the
power base.
Remove the plastic packaging from
the power base. If there is a yellow
packaging band attached to the frame,
remove this as well.
STEP 2
(optional)
Assemble the power base legs.
Screw them in a clockwise direction
into the threaded holes in the frame.
STEP 1
WARNING: PACKAGING
MATERIAL MAY SMOTHER
SMALL CHILDREN AND PETS
Carefully pull the folded power
base unit out of the shipping carton.
Remove and discard the plastic bag.
Unfold the base keeping the unit top
side down. For safety reasons, this
should be performed by 2 people.