H
10. Cement quick change halves 16
H
and 17
H
together.
11. Attach cover 20
H
to quick change halves.
12. Cement axle halves 18
H
and 19
H
into “D”
19. Cement two headlights 29
H
against triangular
stops on headlight backs 30. Make certain that
the beveled edge of headlight is in position
shown in sketch before cementing in place.
20. Locate (do not cement) rod on headlight back
between two ribs on body. Now carefully
cement retainer 31 to body. Add cement only
to where retainer touches body. DO NOT
put cement near rod so that headlights will
operate properly. Hold 31 tightly in place
until cement sets.
24. Cement steering column 39 into notch in
floorboard 40.
25. Next, cement shift lever 41
H
into floorboard as
indicated, then cement floorboard to frame.
26. Cement ice tong halves 42
H
and 43
H
together.
Pin on one half fits between two pins on other
half. Cement tongs to one ice block.
27. Two ice blocks are now cemented
to the frame as shown. Cement
should be added only to the block
edges
not
the “puddle” portions.
The arrangement shown may be
changed to suit. It is best to check
for clearance with the body before
cementing into final position.
shaped holes as shown. Make sure holes for
springs in axle face up as shown.
13. Cement spring 21
H
into holes in axle. While
cement is slightly wet proceed to next step.
Do not operate headlights until cement has
dried overnight.
21. Cement two front axles suspensions 32
H
and
33
H
to side in body as shown It is best to insert
axle into hole in body, THEN insert small pin
on spring into hold in suspension support.
22. Cement fuel tank halves 34
H
and 35
H
together
and cement to body as shown. Repeat for
remaining tank halves 36
H
and 37
H
.
23. Next, cement nose piece 38
H
to front of body.
14. Now take frame and engine assembly
assembled in Step 1 and turn upside down as
shown. Cement end of driveshaft into engine
and spring between ribs on frame.
15. Cement two shock absorber units 22
H
to pins
on axle and into holes as shown.
16. Attach two rear radius rods 23
H
and 24
H
as
indicated.
CHROME PLATED PART. SCRAPE PLATING
WHERE CEMENT MUST GO. CEMENT WILL
NOT STICK TO PLATING.
17. Cement pipes 25
H
and 26
H
to frame. Front
end of pipe fit into frame opening. Rib on frame
fits into notch in exhausts.
18. Next, cement two tailight units 27
H
ito notches
in back pan 28. Cement back pan to frame in
position as indicated by shaded area. Edge of
back pan rests against the mounts for the shock
absorber units.
28. Cement completed frame assembly and
body together.
29. Press inside wheel half 44 into front tire.
Then apply cement to outside wheel
half 45
H
and press into other side of
tire. Hold wheel halves together until
cement sets. Cement wheels to front
axle.
30. Fit slick halves together (do not
ce
ment) lining up the “flat” wrinkled
portion. One slick half has a rib around
the inside which fits into the groove
around the inside of the other half.
31. Fit the outside rear wheels 46
H
into
the assembled slicks and cement
the wheels to the inner wheel
halves 47. Now cement wheel to
rear axle. Flat portion of slick lies
flat on table.
32. Complete your model by cementing
two tailgate chains 48
H
in place as
indicated.
19
H
34
H
31
30
29
H
40
35
H
36
H
37
H
41
H
42
H
43
H
45
H
46
H
48
H
48
H
44
47
39
32
H
38
H
33
H
SCRAPE PLATING
FROM AXLE AS
SHOWN BY SHADING
SCRAPE PLATING
FROM AXLE AS
SHOWN BY SHADING
CENTER ROD
BEVELED
EDGE
SUSPENSION
SUPPORT
HOLE FITS
OVER PIN
ON AXLE
ICE
BLOCK
FRONT
TIRE
SLICK
“U” NOTCH FOR
PIN ON CHAIN
PIN
HOLE FOR PIN
ON RADIUS ROD
FRAME
OPENING
RIB FOR
EXHAUST PIPE
RADIUS ROD
17
H
18
H
27
H
24
H
26
H
25
H
22
H
22
H
23
H
28
16
H
21
H
20
H