First Commissioning
22
5
First Commissioning
WARNING
W5.0012
Serious personal injury
Incomplete device
There is a risk of serious personal injury during the commissioning without
proper installation of the protective guards.
•
During installation, care must be taken to ensure that all necessary
protective guards are properly installed in accordance with the
harmonized standard DIN EN ISO 12100.
•
The commissioning of the incomplete device is prohibited until it has
been completed by the components mentioned in the Declaration of
Incorporation and complies with the regulations of the Machinery
Directive and an EC Declaration of Conformity has been obtained in
accordance with Annex II Part A.
WARNING
W6.0002
Danger to life through electric shock
Damaged power cable
An electric shock can cause burns, cardiac arrhythmia, respiratory arrest,
as well as cardiac arrest.
•
Never use a damaged power cable to connect the device to the
mains!
•
Check the power cable and the plug for any damage before use.
NOTICE
N11.0002
Setting up the device
Disconnecting the device from the mains
A separation of the device from the mains must be possible at any time.
•
Set up the device in such a way, that the connection for the power
cable is always easily accessible.
NOTICE
N12.0023
Location requirements
Unbalance and vibration during operation
The AS 200 tap causes strong unbalance and vibrations during the
operation, which can lead to a movement of the whole device.
•
The installation must be carried out on a stable, anti-slip, vibration-
free base, which is suitable for both, the weight of the device and the
resulting vibrations during operation.
•
In order to ensure safe operation, the AS 200 tap has to be screwed
firmly to the base by means of the transport angles.
Содержание AS200 tap
Страница 2: ...2 Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany ...
Страница 5: ...Notes on the Manual 5 ...
Страница 10: ...Notes on the Manual 10 Service address ...
Страница 15: ...Technical Data 15 3 11 Drive Horizontal circular motions 280 rpm Taps 150 min 1 ...
Страница 21: ...Packaging Transport and Installation 21 Fig 5 Minimum distance between housing and hoist 85 cm 34 inches ...
Страница 44: ...Index 44 Wet sieving 14 Width 13 base 13 Workplace related emission level 12 Y Year of production 18 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...Copyright Copyright by Retsch GmbH Retsch Allee 1 5 42781 Haan Germany ...