17
figure 12: positioning the plastic spacers
Screw the diN rail with fuse and terminals from the hood set (1)
onto the back of the electrical board in the prepared openings using
m4x10 bolts and the cushioning pads and nuts (part of the set) (see
fig. 13).
longer bolts should not be used, under any circumstances!
put the relay board back onto the plastic spacers, applying light
pressure to secure it.
figure 13: Connecting the 0610 hood set
depending on the type of electrical connection used for the
appliance, insert either the X39a (3N~/380-415V) or the X39b
(3~/200-240V) connector from the hood set into plug X39, which
leads from the main terminal block.
The hood could be destroyed by connecting the wrong
connector to plug X39!
in the base of the appliance, break through the flange marked with
the number “3” (see fig. 7a or fig. 7b), insert cable gland pg 13,5
(which is a component of the hood) into the gland and thread the
hood’s power cable through it into the appliance.
Connect the individual wires of the hood’s power cable (2) from
below (3) to terminals u, V and pE from the hood set (see fig. 13).
Technical documentation I Vision Vent 2 Hood I Transport and installation
Содержание VISION vent 2
Страница 1: ...hood VISION vent 2 Perfection in cooking and more read this manual before use Technical documentation ...
Страница 2: ......
Страница 4: ......
Страница 25: ......