5 Installation
This chapter describes the correct unpacking and installation procedures.
5.1 Unpacking
You receive the machine in special packaging.
Keep the packaging intact and store the packaging in a dry location. You need this
packaging when you return the machine to the manufacturer.
1.
Carefully open the packaging.
2.
Remove all materials from the box.
3.
Make sure that all ordered parts have been delivered:
•
B100 Restrain Generator
5.2 Place the machine
This task describes where and how to place the machine.
1.
Place the machine in the premises that needs treatment.
2.
Make sure that the location meets the following requirements:
•
Place the machine at floor level.
•
Place the machine at a location with good air circulation.
•
Place the machine in a location away from normal loading activities.
Make sure that the machine does not touch any foreign objects or plastic structures.
The vapour from the machine is hot and can damage other surfaces.
3.
Place barriers around the machine to protect the machine from potential damage.
4.
Place a small amount of absorbent material under the exhaust to collect possible
condensation.
5.
Plug the mains power supply cord into the electrical socket.
Restrain
Installation 14