2. Installation
(a) Installation and wiring must be performed in accordance with
the local electric code and the following instructions by
professional personnel.
(b) For safety, please cut off the mains power switch before
installation. The battery breaker also needs to be cut off if it is a
long backup time model (“L” model).
(c) Open the terminal block cover located on the rear panel of the
UPS, please refer to the appearance diagram.
(d) For 6K(L) UPS, it is recommended to select the UL1015
10AWG(6mm2) wire or other insulated wire which complies
with AWG Standard for the UPS input and output wirings.
(e) For 10K(L), it is recommended to select the UL1015
8AWG(10mm2) wire or other insulated wire which complies
with AWG Standard for the UPS input and output wirings.
Note: Do not use the wall receptacle as the input power
source for the UPS, as its rated current is less than the
UPS’s maximum input current. Otherwise the receptacle
may be burned and destroyed.
(f) Connect the input and output wires to the corresponding input
and output terminals according to the following diagram.
Note: you must make sure that the input and output
wires and the input and output terminals are
connected tightly.
10
Содержание RP-UPH104T
Страница 1: ...USER S MANUAL On Line 6K 10KVA Uninterruptible Power Supply...
Страница 19: ...Battery Status Output Power Temperature History Record 18...
Страница 36: ...DB 9 Interface of AS400 communication protocol 35...
Страница 39: ...Appendix 1 Outline Description and Back Panel Back view of 6K Back view of 6KL 38...
Страница 40: ...Back view of 10K Back view of 10KL 39...
Страница 41: ...40...