DESKTOP OR SHELF MOUNTING:
Step1.
Attach the four adhesive rubber feet to the bottom of the first switch.
Figure 11: Attaching the Adhesive Rubber Feet
Step2.
Set the device on a flat surface near an AC power source, making sure there are
at least two inches of space on all sides for proper air flow.
Step3.
If installing a single switch only, go to “Connecting to a Power Source” at the end
of this Chapter.
Step4.
If installing multiple switches, attach four adhesive feet to each one. Place each
device squarely on top of the one below, in any order.
INSTALLING AN
OPTIONAL SFP
TRANSCEIVER
You can install or remove a mini-GBIC SFP from a mini-GBIC slot
(Except GEL2-ESW08) without having to power off the switch.
Use only Manufacture mini-GBIC.
N
OTE
:
The mini-GBIC slots are shared with the two 10/ 100/
1000Base-T RJ-45 ports. If a mini-GBIC is installed in a
slot, the associated RJ-45 port is disabled and cannot be
used (GEL2-ESW10G only)
The mini-GBIC ports operate only at full duplex. Half
duplex operation is not supported.
Ensure the network cable is NOT connected when you
Publication date: Oct., 2012
Revision A3
13
Содержание GEPOESM-ESW26K Series
Страница 1: ...26 Port L2 PoE Plus Managed Switch Installation and Getting Started Guide ...
Страница 10: ...Back of the Switches GEPoESM ESW26 GEPoESM ESW26K Publication date Oct 2012 Revision A3 2 ...
Страница 16: ...Figure 6 Office Network Connection GEL2 ESW08 GEL2 ESW10 GELPoE2 ESW26 Publication date Oct 2012 Revision A3 8 ...