
VIONiC RSLM20/RELM20 installation guide
9
Thoroughly clean and
degrease the substrate
with a lint-free cloth.
Fit clips on one side of the scale and align to the specification given in the installation
drawing. Only the special low‑profile screws supplied with the clips should be used.
Additional screws can be purchased from Renishaw (A-9584-2047 pack of 25).
NOTE:
When mounting scale to vertical surfaces, temporary bridge clamps
(A‑9584‑2112) are available which support the scale prior to fitting clips.
Torque 0.5 Nm
Torque 0.5 Nm
Clean scale.
Place datum clamps against the scale and secure using the
special M3 low‑profile screws supplied.
Clean the underside of scale using approved solvents
(‘Storage and handling’, page 3)
Fit the remaining clips using clip setting shim M-9584-0928
(provided with A-9584-2050 clamp set).
Clip/clamp mounting installation
1.
3.
2.
4.
5.