AN1235 Rev 0.00
Page 2 of 7
Feb 2, 2006
ISL59481EVAL1
Testing the Evaluation Board
Testing the video and sync signal paths is accomplished
using 1 or more RGB+H/V test video sources and a video
monitor as the measurement device. Before powering the
board, connect the jumpers as follows:
1. Connect jumpers J-S0, J-S1 and J-S2 to the MANUAL
position (center to right post).
2. Connect jumper J1 to the single-step position (center to
left post).
FIGURE 1. ISL59481EVAL1 TOP VIEW