3.1  Package information

3.  Installation and startup

Figure 3-1 package information

3.2  Installation environment

1) In order to achieve optimal performance, the ambient temperature should be kept lower than 45 °C.
2) For the convenience of checking the LCD display and possible maintenance activities, please install the inverter at eye level.
3) Inverters should NOT be installed near inflammable or explosive items. Any strong electro-magnetic equipment should be 
kept away from installation site.
4) Product label and warning symbol shall be clear to read after installation.
5) Please do not install inverter under direct sunlight, rain and snow.

Warning

Before installation and maintenance, AC and DC side doesn’t carry electricity, but if DC side is 
just disconnected, capacitance still contains electricity, so please wait for at least 5 minutes 
to ensure the capacitors completely release the energy and inverter is not electrified.

Note

Inverters must be installed by qualified person.

①.There are 2 PV connectors for R3-4/5/6/8/10/12K-DT and 3 PV connectors for R3-15K-DT
②.There are 2 PV connectors for R3-4/5/6/8/10/12K-DT and 3 PV connectors for R3-15K-DT

Quality Certificate

Model:

QC:

This is to verify that the product

         is qualified to delivery

Product Test Report

Product

QC:

1

2

3

4

5

6

7

8

9

10

Conclusion:

Pass

NG

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Pass

Text Items

Production Date

SN

xxxx

xxxx

xxxxxxxxx

xxxx

xxxx

xxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

xxxx

xxxxxxxxx

INVERTER*1

MOUTING PANEL*1

PV CO)

1

PV CONNETOR(-)

2

GPRS/WIFI(OPT.)

EXPANSION TUBE*4

FACTORY REPOER*1

SCREW*1

QC PASS*1

QIG*1

In consideration of heat dissipation and convenient dismantlement, the minimum clearances around the inverter should be 
no less than the following value.

3.3  Installation position

1) The installation method and mounting location must be suitable for the inverter's weight and dimensions.
2) Mount on a solid surface.
3) Select a well-ventilated place sheltered from direct sun radiation.

Figure 3-3 Distance required of Invertors

Figure 3-2 installation position

Figure 3-2 installation environment

Max 15°

Содержание R3 Micro Series

Страница 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Страница 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Страница 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Страница 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Страница 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Страница 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Страница 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Страница 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Страница 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Страница 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Страница 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Страница 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Страница 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...

Отзывы: