Renac R3 Micro Series Скачать руководство пользователя страница 3

R3 Note Series     

User Manual

2

3

R3 Note Series     

User Manual

1.2  Applied designations

1.  Introduction

This manual describes solar inverters 

 

R3-4K-DT/R3-5K-DT /R3-6K-DT/R3-8K-DT/R3-10K-DT/R3-12K-DT/R3-15K-DT. 

These inverters are transformerless based inverter.

Please read the safety instructions in this manual first. Throughout the manual it is assumed that the reader is familiar with 
AC and DC installations and knows the rules and regulations for electrical equipment and for connecting it to the utility AC 
grid. It is especially important to be familiar with the general safety rules for working with electrical equipment.

Throughout the manual important information is shown at different levels depending on the character of the information, as 
shown here:

1.3  Important safety information 

Read this before installing, operating or maintaining the inverter.

1.4  System sizing

1.1  Introduction

Safety information important for human safety. Violation of warnings may 
result in injury to persons or death.

Danger of high voltage and electric shock!

Signals danger due to electrical shock and indicates the time (5 minutes) 
to allow after the inverter has been turned off and disconnected to ensure 
safety in any installation operation.

Danger of hot surface!

Product should not be disposed as normal household waste.

CE Mark

ROHS Mark

Information important for the protection of property. Violation of this type 
of information may cause damage and loss of property.

Useful additional information or “Tips and Tricks” on specific subjects.

When dimensioning a photovoltaic system, it must be ensured that the open 
circuit voltage of the PV string never exceeds the maximum permissible 
input voltage of 1000V DC. The PV string open circuit voltage during parallel 
string operation is 950V. Higher voltages may result in permanent damage 

to the inverter.

Before installation:

Check for damage to inverter and packaging. If you are in doubt, please contact your supplier 
before installing the inverter. Check the voltages of the solar modules and make sure they are 
within the limits of the inverter specifications before connecting them to the inverter.

Installation:

Only trained and authorized personnel familiar with local electrical codes may install the inverter. 
For optimum safety, please follow the steps described in this manual. Keep in mind that the 
inverter has two voltage carrying sides, the PV input and the AC grid.

Disconnecting the inverter:

Always disconnect the AC line first! Afterwards disconnect the PV lines. Note that the inverter 
can still be charged with very high voltages at hazardous levels even when it is disconnected 
from grid and solar modules. Wait at least 5 min. before proceeding, after having disconnected 
from grid and PV panels.

Operating the inverter:

Before connecting the AC grid to the inverter, make sure that the installation cover is mounted 
again. The inverter must not be open during operation.

Maintenance and modification:

Only authorized personnel are allowed to repair or modify the inverter. To ensure optimum 
safety for user and environment, only the original spare parts available from your supplier 

should be used.

Functional safety parameters:

Unauthorized changes of functional safety parameters may cause injury or accidents to people 
or inverter. Additionally it will lead to the cancelling of all inverter operating approval certificates.

Содержание R3 Micro Series

Страница 1: ...R3 4K DT R3 5K DT R3 6K DT R3 8K DT R3 10K DT R3 12K DT R3 15K DT UserManual Series R3 Note...

Страница 2: ...ackageinformation 8 3 2Installationenvironment 8 3 3Installationposition 9 3 4Mountingprocedure 10 3 5Electricalconnection 11 3 6StartingtheInverter 15 4 UserInterface 15 4 1Ledandkey 15 4 2LCDdisplay...

Страница 3: ...red that the open circuit voltage of the PV string never exceeds the maximum permissible input voltage of 1000V DC The PV string open circuit voltage during parallel string operation is 950V Higher vo...

Страница 4: ...mainly on internal and ambient temperatures The limitation is calculated continuously and always allows the maximum possible amount of energy to be produced Please use the tool supplied by Renac Power...

Страница 5: ...id meet Grid standards BDEW MV Germany power Grid meet Grid standards VDE 0126 Italy power Grid meet Grid standards CEI 0 16 UK power Grid Greece Island power Grid Czech Republic power Grid meet Grid...

Страница 6: ...ed person There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT There are 2 PV connectors for R3 4 5 6 8 10 12K DT and 3 PV connectors for R3 15K DT Quality Certificate...

Страница 7: ...s section of ac cables Description A B C D No Figure 3 5 Strip off N L1 L2 L3 cables 2 Strip off PE cable as gure 3 6 1 Add breaker or fuse to AC side the speci cation should be more than 1 25 times o...

Страница 8: ...the terminal accord ing to the wire sequence L1 L2 L3 N PE so that the insulating terminal is ush with the surface of the terminal and the crimping screw torque is 2 0 0 1N m 6 Insert the main part of...

Страница 9: ...cable connected to the two string correctly and it s polarity 3 The unused terminals are covered Starting the inverter Close the DC and AC circuit breaker If the solar panels provide enough energy the...

Страница 10: ...t 1 2 3 4 Press pushbutton less than 1 sec several times until you reach the Setting menu Press pushbutton long in order to enter the setting menu Press pushbutton less than 1 sec several times until...

Страница 11: ...nverter is 60 months from the date of installation and no more than 66 months 5 5 years from the date of shipment from factory Please report defective device with a brief error description and SN code...

Страница 12: ...o factory or and repaired products are sent from factory to user 5 2 Service after warranty expiration 1 2 3 4 Possible actions Isolation Fault Isolation Fault 2 LCD display Clearable Fault Fault 1 Ch...

Страница 13: ...AC P OW E R T E C H N O L O GY C O LT D Add Block 6 No 2 West Jinzhi Road Suzhou National Hi Tech District Suzhou China Tel 86 0512 66677278 info renacpower com www renacpower com SMARTENERGYFORBETTE...

Отзывы: