background image

REMKO – powerful like a bear 

REMKO RKS 510 / 513 / 524 

REMKO RKS 513 H / 524 H 

Combi Air Conditioning Units 

Edition GB  – M08 

Operation 

Technology 

Spare Parts 

Содержание RKS 510

Страница 1: ...REMKO powerful like a bear REMKO RKS 510 513 524 REMKO RKS 513 H 524 H Combi Air Conditioning Units Edition GB M08 Operation Technology Spare Parts...

Страница 2: ......

Страница 3: ...ration 12 Adding Refrigerant 12 Initial Operation 12 Customer Service and Guarantee 13 Environment and Recycling 13 Wiring Diagram 13 Initial Operation Certification 15 Combi Air Conditioning Units RE...

Страница 4: ...eratures between 15 and 46 C Never open the units housing There may cause an electric shock Protect the connection lines from being damaged for example by animals All REMKO air conditioners are suppli...

Страница 5: ...in your area Troubleshooting This unit has been designed based on state of the art manufacturing methods and it has been tested repeatedly to ensure that it is working properly However should problems...

Страница 6: ...rting current LRA A 23 31 77 31 77 Supplied fuse protection recommended A 16 16 25 16 25 Sound pressure level max dB A 49 49 59 49 59 Width mm 850 850 950 850 950 Depth mm 322 322 417 322 417 Weight k...

Страница 7: ...ng air conditioners high pressure and electrical current can pose hazards Be especially careful when covers are removed The components in the cold cycle can reach tem peratures of more than 70 C Selec...

Страница 8: ...s containing cement or lime Location of installation for the outdoor part The outdoor part must be set up on a surface that is level smooth and solid The outdoor part can either be set up outside or i...

Страница 9: ...escribe installation of the cold cycle and the assembly of the indoor unit and out door part 1 The required cross sections are provided in the Technical Data table 2 Install the indoor unit and connec...

Страница 10: ...ly removed from the system the manometer station valves are closed and the valves of the outdoor part are opened as described in the section Initial Operation Impermeability Test Once all connections...

Страница 11: ...both lines through the rubber protective rings of the fixed connection plate 5 Clamp the lines as shown in the wiring diagram on page 13 6 Place the line securely in the strain relief and reas semble...

Страница 12: ...documented Prior to handover After all components have been connected and checked the system can be put into operation To ensure that the unit is functioning properly a func tional check must be perfo...

Страница 13: ...liability for damage re sulting from non compliance with manufacturer specifi cations and legal requirements or if modifications are made to the units Only authorised personnel may come into contact w...

Страница 14: ...P 1 JP 2 JP 3 JP 4 JP 5 JP 6 JP 7 JP 8 Fuse 3 A 250 V TS 3 Winterregulation P1 Sensor VM C3 brn blu Ventilator blk brn wht blk or wht Legende TS1 terminal strip power supply TS2 terminal strip to indo...

Страница 15: ...ional quantities g Condensation pump Operator Assembly location Name Street Postal code city Telephone Fax Test of cold cycle Result Visual check Assembly of outdoor part and indoor unit R good Q poor...

Страница 16: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606260...

Отзывы: