Commissioning
Commissioning should only be
performed by specially trained
personnel and documented
after the certificate has been
issued.
Observe the manuals for the
indoor unit and outdoor unit
when commissioning the
entire system.
NOTE
Functional test for heating
mode.
1. Switch the supply voltage on.
2. Use the remote control to
switch on the unit and select
the heating mode, maximum
fan speed and highest target
temperature.
Final tasks
■
Re-fit all the dismantled parts.
■
Familiarize the operator with
the system.
4. Check the control system
for the unit using the
functions described in the
chapter "Operation". Timer,
temperature setting, fan speeds
and changing to ventilation or
dehumidification mode.
5. Check the correct function
of the condensation line by
pouring distilled water into the
condensation tray.
A bottle with a spout is
recommended for pouring the
water into the condensation
tray.
Functional test for cooling
mode.
1. Switch the supply voltage on.
2. Use the remote control to
turn on the unit and select
the cooling mode, maximum
fan speed and lowest target
temperature.
3. Measure and record all
the required values in the
commissioning report and
check the safety functions.
3. Measure and record all
the required values in the
commissioning report and
check the safety functions.
4. Check the control system for
the unit using the functions
described in the chapter
"Operation".
Timer, temperature setting, fan
speeds.
Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.
NOTE
23
Unit dimensions
We reserve the right to modify the dimensions and constructional design as part of the ongoing technical development process.
All values in mm
MXW 200 - 260
250
750
205
280
815
215
MXW 350
MXW 520
292
920
224
Содержание MXV 200
Страница 2: ......
Страница 24: ...Notizen REMKO MXW 24...