Wiring Diagram HTL 200/250 FB 

F1-3 = Power 

fuses 

F4 

=  Motor protection switch 

F5 

=  Back-up fuse (plug) 

F6 = 

Control 

fuse 

H3 

=  Operating light (heating) 

H4 = 

Malfunction 

light 

(burner) 

H5 

=  Operating light (fan) 

H6 = 

Malfunction 

light 

(fan) 

H7 = 

Malfunction 

light 

(temp.limiter) 

H8-10  =  Control lights (phases) 
H11 

=  Control light (control phase) 

K1M = Fan 

contractor 

K2M = 

-contactor 

K3M = Y-contactor 
K1T = 

Time 

relay 

K5-6  =  Contactor for phase sequence relay 
K7 = 

Auxiliary 

relay 

KX5-6  =  Phase sequence relay 
KB 

=  3-speed combination regulator 

P1 = 

Operating 

hours 

counter 

M1 = 

Fan 

motor 

RT 

=  Room thermostat socket 

S1 = 

Operating 

switch 

S2 = 

Burner 

reset 

STB 

=  Safety temperature limiter 

TR 

=  Temperature control thermostat 

TW = 

Temperature 

monitor 

X0 

=  Connection cable with 16A plug 

X1 

=  Terminal strip in control box 

X2 

=  Terminal strip PE 

X3 

=  Terminal strip in terminal box (front) 

We reserve the right to make changes to dimensions and design in the interest of technical progress.

 

t

t

1

0

2

K3M

K1M

K6

H7

H3

H6

H5

grün

P1

h

K2M

15

1

4

K3M

K1M

N

L1

F4

K1T

STB

A1

A2

A1

A2

A1

A2

A1

A2

A1

A2

A1

A2

X1 5

X1 4

X1 6

TR

2

rot

grün

rot

K5

K2M

K3M

D-Schütz

Phasenfolge
    Relais

Zeitrelais

Ventilator
  Schütz

Betriebslampe
   Ventilator

Betriebs-
stunden-
zähler

1

2

3

4

5

6

X1:4 X1:5 X1:8

X1:7 X1:6

X2

STB

TW

TR

KB

K1T

t<15s

Störlampe
Brenner

Y-Schütz

Störlampe
Ventilator

Betriebslampe
     Heizen

Störlampe
Temperatur-
begrenzer

Dreifach-Kombinationsregler

KX6

KX5

K6

K5

F 6

6 A

11

11

14

14

62

52

61

51

34

14

33

13

95

97

98

96

12

14

11

11

16

18

22

32

21

31

6

3

X1 N

X1 10

t

2

1

3

H4

RT

1

5

4

X1 8

X1 12

X1 11

TW

rot

X3 1

X3 5

X3 4

1

5

6

Brennerstecker (WS)

2

3

L1

T2

T1

X3 6

X3 3

7

X1 13

4

X3 7

S3

B4

N

X1 7

S1

1=Heizen
2=Lüften

8

S2

Brenner-
 Reset

K7

A1

A2

Hilfsrelais

1 = heating 
2 = ventilate 

malfunction light 

burner 

burner reset 

auxiliary 

relay 

operating  

light  

heating 

malfunction light 

temperature 

limiter 

malfunction  

light fan 

operating 

hours counter 

operating 

light fan 

fan contactor 

contactor for 

phase sequence 

relay 

burner plug (WS) 

red 

red 

green 

green 

triple combination control 

time relay 

-contactor 

Y-contactor 

phase sequence relay 

control circuit  

& burner 

power socket  

near the burner 

green 

F1-3 

16A retarding 

H8-10 

green 

Содержание HTL 150 FB

Страница 1: ...REMKO powerful like a bear REMKO HTL 150 FB HTL 250 FB Mobile oil fired heating centers Edition D R02 Operation Technology Spare Parts...

Страница 2: ......

Страница 3: ...TL 150 FB 16 Wiring Diagram HTL 200 250 FB 17 Wiring Diagram HTL FB 18 Technical Data 18 Maintenance Log 19 Read these instructions carefully before setting up operating the unit Our guarantee becomes...

Страница 4: ...r protected from weather conditions They are operated with a separate forced air oil burner and are suitable for outdoor operation The units are equipped both with a high performance axial fan that re...

Страница 5: ...temperature 35 to 40 C automatically switches the air supply fan on beforehand The green fan operating light is illuminated on the control panel for monitoring purposes Warm air is blown out When the...

Страница 6: ...for combustion exists when for example the room content in m is equivalent to at least 10 times the rated heat output in kW of all heating units in operation in the room and natural air venti lation i...

Страница 7: ...eans of pipes or special hot air and plastic hoses The possible lengths of these lines depend on the air side resistance of the warm air ducting Make sure to observe the following when using warm air...

Страница 8: ...t be exceeded Setting the thermal overcurrent relay 1 Measure each phase separately to eliminate meas urement errors 2 Set the thermal overcurrent relay according to the following calculation Multiply...

Страница 9: ...cool the combus tion chamber and the heat exchanger and switches off at a later time The fan can be run several times until the unit is finally switched off Never interrupt the power supply except in...

Страница 10: ...lters if necessary Check the unit for mechanical damage and replace defective parts if necessary Check the fan blades and combustion chamber with heat exchanger on a regular basis for dirt and clean t...

Страница 11: ...on 3 Attach the exhaust connection properly Check the seal 7 and replace if necessary 4 Reattach all lines and connections and check them 5 Put the unit into operation and check that all operating mod...

Страница 12: ...tance and chimney draft Loosen the Allen screw and ro tate the air intake nozzle to the desired position pay attention to the arrow min lower burner pressure max higher burner pressure Adjusting the s...

Страница 13: ...opens and the burner would run with an insufficient quantity of air Setting Air quantity level 2 adjustment lever orange Turn back the adjustment lever for the Air quantity level 2 counter clockwise D...

Страница 14: ...16 17 18 20 19 21 22 23 11 9 8 46 7 30 29 28 27 26 31 32 33 34 35 36 39 38 40 41 42 43 44 45 25 24 Unit housing Combustion chamber with heat exchanger 47 31 We reserve the right to make changes to dim...

Страница 15: ...ottom rear 1105389 1105389 1105389 26 Fan console 1105390 1105391 1105391 27 Fan 1105375 1105377 1105380 28 Start up nozzle 1105376 1105378 1105378 29 Air intake plate 1105392 1105393 1105393 30 Linin...

Страница 16: ...N X1 10 t 2 1 3 t t 1 0 2 K7 H4 H7 H3 H6 1 N L1 F4 RT STB A1 A2 1 5 4 X1 8 X1 12 X1 11 X1 7 X1 5 X1 4 X1 6 TW rot rot gr n rot St rlampe Brenner St rlampe Ventilator Betriebslampe Heizen Hilfsrelais F...

Страница 17: ...3M K1M N L1 F4 K1T STB A1 A2 A1 A2 A1 A2 A1 A2 A1 A2 A1 A2 X1 5 X1 4 X1 6 TR 2 rot gr n rot K5 K2M K3M D Sch tz Phasenfolge Relais Zeitrelais Ventilator Sch tz Betriebslampe Ventilator Betriebs stunde...

Страница 18: ...6 8 7 1 Power consumption fuel pre heating W 300 300 300 Fuse protection customer installed A 3 x 16 3 x 16 3 x 16 Temperature increase t K 56 57 59 Sound pressure level LpA 1m 2 dB A 71 74 74 Air int...

Страница 19: ...Date 9 Date 10 Date Signature Signature Signature Signature Signature 11 Date 12 Date 13 Date 14 Date 15 Date Signature Signature Signature Signature Signature 16 Date 17 Date 18 Date 19 Date 20 Date...

Страница 20: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage PO Box 1827 Phone 49 5232 606 0 Fax 49 5232 606260 E Mail info remko de Internet www remko de...

Отзывы: