Care and maintenance

Care

 

■   

Clean the units with a damp cloth
(by adding a liquid household 
cleaner, for instance).  
Do not use any caustic, abrasive or 
solvent-based cleaning products.

Maintenance

■   

We recommend that you take out 
a maintenance contract with an 
annual service from an appropriate 
specialist firm.

This will guarantee that your 

equipment always operates reliably!

      NOTE

■   

Regularly check that the safety valve 
is functioning. 

The expansion water amount at 
maximum heat represents approx. 3.5 % 
of the storage tank capacity.
When the safety valve test knob is lifted 
or in the “Test” position, the water must 
flow unhindered out of the safety valve 
body into the drainage funnel.  

 

!

    CAUTION

This can cause the cold water 

supply and parts of the storage 

tank connection fitting to become 

hot!

If  the  storage  tank  is  not  heated  or  if 
hot  water  is  removed,  no  water  should 
be dripping from the safety valve. If this 
does  occur,  either  the  pressure  in  the 
water pipe is greater than the permitted 
value  or  the  safety  valve  is  defective.  If 
the  pressure  in  the  water  pipe  is  higher 
than  permitted,  a  pressure  relief  valve 
must be used.

Installation instructions 
for qualified personnel 

General instructions prior to installation

■ 

Ensure that the area in which the 
unit is to be operated is free of frost 
and easily accessible for required 
maintenance, repairs and even 
for the possible replacement of 
the unit (e.g. avoid overly narrow 
thoroughfares and doorways).

■ 

When installing the buffer tank in 
unusual locations, such as in lofts, 
residential units with floors that 
are sensitive to water, storerooms, 
etc., take account of the possibility 
of leaking water and ensure that 
a facility is in place to catch the 
water, including appropriate drainage 
methods.

■ 

The unit may only be positioned and 
operated on level surfaces.

Содержание HPS 500

Страница 1: ...REMKO STORAGE TANK SYSTEMS Buffer tank for hot water HPS 500 MPS 800 MPS 1000 Operation Technology Edition GB F08 ...

Страница 2: ......

Страница 3: ... the installation location or on the unit itself Subject to modifications no liability accepted for errors or misprints Safety notes 4 Environmental protection and recycling 5 Guarantee 5 Intended use 5 Operation 5 Description 6 Shutdown 6 Care and maintenance 7 Installation instructions for qualified personnel 7 8 Installation 8 9 Fitting the insulation 10 12 Connection examples 13 14 Commissioni...

Страница 4: ...malfunctions Units and components may not be operated in areas where there is an increased risk of damage Observe the minimum clearances Safety notes The electrical power supply is to be adapted to the requirements of the units The operational safety of units and components is only assured if they are fully assembled and used as intended Safety devices may not be modified or bypassed Do not operat...

Страница 5: ...he components in accordance with local regulations and in an environmentally safe manner e g through authorised disposal and recycling specialists or at collection points Intended use The buffer tanks are employed for the storage of hot water in all types of hot water central heating systems solid fuel oil fired boilers heat pumps solar plant gas electric instantaneous water heaters within enclose...

Страница 6: ...s in your area Description The buffer tanks are used to store hot water in all types of hot water central heating systems combustible burners for solid fuel oil fired boilers heat pumps solar plants gas electric instantaneous water heaters within enclosed spaces The storage tank volume can be adapted to your particular needs by connecting several buffer tanks to form batteries The buffer tanks may...

Страница 7: ...e tank is not heated or if hot water is removed no water should be dripping from the safety valve If this does occur either the pressure in the water pipe is greater than the permitted value or the safety valve is defective If the pressure in the water pipe is higher than permitted a pressure relief valve must be used Installation instructions for qualified personnel General instructions prior to ...

Страница 8: ...f the buffer tank including the weight of the water the nominal capacity in order to ensure that the statics of the load bearing surface are not exceeded Ensure proper clearance from firing systems Make sure that units with enclosures which are installed in small tight spaces or in suspended ceilings have the connection block water and electric connections and heater installation still freely acce...

Страница 9: ... combustible burner for solid fuel or one or two immersion heater elements can be fitted Please note that the auxiliary heater must not be used as a permanent heating system Please note that the inflow restrictor must first be bent back with a pipe or similar You must bleed the buffer tank Buffer tank with auxiliary heater immersion heater elements Installation should only be performed by authoris...

Страница 10: ...posed of immediately or cut up Fitting the insulation 2 Hook the unperforated insulation section onto the hooked closure strip on the insulation section that you attached previously 3 Hook the supplied cover assembly strips over the hooked closure strip This will prevent the hooked closure opening during further installation 4 After fitting the cover assembly strip the insulation can be closed usi...

Страница 11: ...ng down lightly In order to achieve optimum heat insulation there must not be an air gap between the round section and the insulation CAUTION 6 Correctly position and attach the insulation cover using the hooked strip openings on the top of the insulation 7 Fit the supplied collars to the connections ...

Страница 12: ...ning Any stress whitening which occurs through improper handling can be carefully removed or minimised using a hot air blower Depending on the heating capacity of the hot air blower it may be necessary to maintain a minimum distance between the insulation and the blower Naked flames are prohibited CAUTION During operation the tank temperature must not consistently exceed 110 C NOTE When fitting th...

Страница 13: ...e D HPS 500 storage tank example 1 Cooling cycle 2 Mixed heating cycle 3 Hot water 4 Cold water This hydraulic circuit diagram is only to be used as a planning aid and does not replace an installation drawing Hydraulic systems provided by the customer must be designed and planned by a specialist installer ...

Страница 14: ...PS 1000 storage tank E Boiler wall heating device F Solar 1 Hot water 2 Cold water 3 Unmixed heating cycle 4 Mixed heating cycle 1 5 Mixed heating cycle 2 This hydraulic circuit diagram is only to be used as a planning aid and does not replace an installation drawing Hydraulic systems provided by the customer must be designed and planned by a specialist installer ...

Страница 15: ...ally trained personnel DIN VDI 2035 NOTE Flange installation port Depending on the design of your system fine tube heat exchangers may be attached to the boiler flanges First tighten the nuts by hand Then tighten the nuts in the sequence specified below to a torque of 20 Nm to max 25 Nm Fitting the flange installation port Flange ring Seal Supporting disc Flange plate During the heating process al...

Страница 16: ...process Unit type Nominal contents l Max operating temperature C Operating pressure bar Test pressure bar Tilt height mm Weight kg HPS 500 500 95 3 4 5 1670 113 Unit type Dimensions in mm a b c d e f g Ø h i HPS 500 220 620 1010 1390 1250 1640 650 340 1725 HPS 500 Flange 12xM12 1 bolts 6 4 6 4 6 4 6 4 6 4 6 4 6 4 6 4 6 4 a b c d Øg exterior h e f i 6 4 6 4 1 2 40 40 240 ...

Страница 17: ...he right to modify the dimensions and design as part of the ongoing technical development process MPS 800 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F ø 790 1 2 F 1 2 F 1 2 F 1 2 F ø 240 6 4 F 260 500 630 1030 1230 1430 1694 Sensor strips 40 6 0 40 6 0 Tilt height without insulation 1750 mm Diameter with insulation 990 mm Height with insulation 1735 mm ...

Страница 18: ... 176 We reserve the right to modify the dimensions and design as part of the ongoing technical development process MPS 1000 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F 6 4 F ø 790 1 2 F 1 2 F 1 2 F 1 2 F ø 240 6 4 F 310 580 745 1250 1470 1710 2050 Sensor strips 40 6 0 40 6 0 Tilt height without insulation 2090 mm Diameter with insulation 990 mm Height with insulation 2135 mm ...

Страница 19: ...lass B2 in accordance with DIN 4102 Number of parts 2 or 3 divided outside of the connection levels Environmental compatibility Min 70 recycled material in the raw materials even the matting itself is recyclable Toxicologically harmless Yes CFC and HCFC free Yes Other properties Good sound insulation kind to the skin and hypoallergenic Technical data for the insulation We reserve the right to modi...

Страница 20: ...REMKO GmbH Co KG Air conditioning and heating technology Im Seelenkamp 12 D 32791 Lage Postfach 1827 D 32777 Lage Telephone 49 5232 606 0 Fax 49 5232 606 260 E mail info remko de Website www remko de We reserve the right to make technical changes and provide no warranty as to the accuracy of this data ...

Отзывы: