The operation of the tank takes 
place through the hot water valve of 
the service water fixture (mixing tap).
Therefore, the tank is under continuous 
line pressure. In order to protect 
the inner tank against excessive pressure 
when heating up, the accumulating 
expansion water is discharged through 
the safety valve.

The return flow valve prevents the return 
flow of the hot water into the cold 
water network during a pressure drop in 
the line and thereby protects the boiler 
from heating up without water.

With the shut-off valve the tank can 
be disconnected from the cold water 
network and thus its pressure and can 
be emptied through the drain valve if 
necessary.

Circulation connect

Due to significant energy loss, a 
circulation connection should be 
avoided when possible. If a highly 
branched service water network requires 
a circulation line, this must be well 
insulated and the circulation pump 
controlled via a timer and thermostat. 
The switching temperature of the 
thermostat should be kept low (45°C). 
The circulation connection piece has an 
external thread.

Flange installation port 
 
Depending on the system design, flange 
heating cartridges or fin-tube heat 
exchangers can be attached at the boiler 
flange Ø180 (clear diameter Ø117 mm, 
hole circle Ø150 mm, 8xM12).

■ 

Install the flange heating cartridges in such 
a way that the sensor of the temperature 
regulator is positioned at the top.

■ 

First tighten the nuts by hand.

■ 

Then tighten the nuts, in the 
sequence specified below, to a 
torque of 20 Nm to max. 25 Nm.

 Fitting the flange installation port

Flange ring

Seal

Supporting disc

Flange plate

Содержание EWS 300

Страница 1: ...REMKO TANK SYSTEMS Tank for process hot water EWS 300 Operation Technology Edition GB W12...

Страница 2: ......

Страница 3: ...g manual is a translation of the German original Subject to modifications no liability accepted for errors or misprints Safety notes 4 Environmental protection and recycling 5 Warranty 5 Intended use...

Страница 4: ...can cause malfunctions Units and components may not be operated in areas where there is an increased risk of damage Observe the minimum clearances Safety notes The electrical supply is to be adapted t...

Страница 5: ...torage of hot water Any different or additional use shall be classed as non intended use The manufacturer supplier assumes no liability for damages arising from such use The user bears the sole risk i...

Страница 6: ...k hot water may escape ATTENTION When placing the tank back into service ensure that it is filled with water and that water which is free of bubbles is escaping from the valves Permanent decommissioni...

Страница 7: ...a specialist at least once every 2 years of operation and this inspection must be documented If servicing tasks are performed the cleaning and servicing flange should be opened and the tank inspected...

Страница 8: ...f the water the nominal capacity in order to ensure that the statics of the load bearing surface are not exceeded Ensure proper clearance from firing systems Installation may only be performed by auth...

Страница 9: ...pumps fin tube heat exchangers electric heaters must be electrically insulated from the tank For the protection of the above mentioned plug in built in components against the current induced corrosion...

Страница 10: ...nnection pressure tight The hot water heaters are pressure tight tanks for which pressure tight connections can be made If the line pressure is higher a customer provided pressure reducing valve must...

Страница 11: ...w restrictor installed between the safety valve and the cold water feed of the tank The safety valve must be set to a triggering pressure which is below the nominal pressure of the tank After the conc...

Страница 12: ...ue to significant energy loss a circulation connection should be avoided when possible If a highly branched service water network requires a circulation line this must be well insulated and the circul...

Страница 13: ...uit ATTENTION However under no circumstances may the supply and return lines be blocked as otherwise the water in the register will not have room to expand and there is a risk of damage to the heat ex...

Страница 14: ...missioning Before being placed into service the register must be flushed in order to remove any soiling e g scale from the heating circuit The smooth pipe heat exchanger register must be rinsed out pr...

Страница 15: ...et temperature the actual temperature of the water produced and that shown on any temperature indicator should be approximately the same Commissioning should only be performed and documented by specia...

Страница 16: ...with 50 C tank temperature and 45 C tap temperature Screw in heater installation depth EWS 300 I F A B C E 85 G H Unit type Dimensions in mm H D A B C E F G I EWS 300 1435 680 320 840 990 1160 345 11...

Страница 17: ...e C 10 10 10 10 Heating circuit flow rate l h 600 1200 1800 2400 Cycle output kW 16 0 22 7 26 4 28 8 Supply temperature C 60 60 60 60 Hot water temperature C 50 50 50 50 Cold water temperature C 10 10...

Страница 18: ...18 REMKO EWS 300 Notes...

Страница 19: ...19...

Страница 20: ...reserve the right to make technical changes and provide no warranty as to the accuracy of this data REMKO GmbH Co KG Air conditioning and heating technology Im Seelenkamp 12 D 32791 Lage Postfach 1827...

Отзывы: