7.6 Commissioning report
System operator
System location
Serial numbers
REMKO EFS25
- Medium flow rate probes
- Controller
- Software version
Primary piping
Ø
=
mm
l =
m
Secondary piping
Ø
=
mm
l =
m
Other installations
q
Circulation set
q
Return distribution set
q
Miscellaneous:
Are both circuits cleaned and bled properly? (no air noises in the pump)
q
Bled
Are all shut-off valves in the cold water supply opened?
q
Opened
Is pressure of at least 1.5 bar present on the primary side?
q
Checked
Is pressure of at least 2.5 bar present on the secondary side?
q
Checked
Is an error message shown on the display?
q
No message
Installation operation
Date, Signature
8
Maintenance
After each retroactive structural modification to the
primary side (e.g. installing a dirt separator, a dirt
trap or a mixing valve), you must start a new com-
missioning procedure in the controller to ensure
optimum regulation.
You should also carry out commissioning again
after adjusting the mixing valve temperature.
A specialist must check that the safety valve is
functioning correctly when commissioning and at
least once per year.