Contents
Carefully read this operating manual prior to commissioning / using
the equipment!
These instructions are an integral part of the unit and must always be
kept in the vicinity of the installation location or on the unit itself.
This operating manual is a translation of the German original.
Subject to modifications; no liability accepted for errors or misprints!
Safety notes
4
Environmental protection and recycling
4
Warranty
4
Intended use
4
Transportation and packaging
5
System description
5
Operation
6-12
Decommissioning
12
Care and maintenance
12-13
Troubleshooting and customer service
14-15
Installation instructions for qualified personnel
16-19
Installation
19
Connection of quick-release couplings
20
Leak testing
21
Pumping down to vacuum
21
Condensate draining and ensured discharge
21
Electrical connection
21-22
Electrical connection diagram
22
Electrical drawings
23
Before commissioning
24
Adding refrigerant
24
Commissioning
24-25
Unit dimensions
26
Exploded views
27-28
Spare parts lists
27-28
Technical data
29
EC – Declaration of Conformity
30
Made by REMKO
3