en
52
Installation
Indications,
functions and options
Messages
Commissioning
Operation and function
7
Channel overview
7.1
Display channels
Note
The display and adjustment channels as well as the adjustment ranges de-
pend on the system selected, the functions and options as well as on the
system components connected to the controller.
Display of drainback time periods
Initialisation
INIT
ODB initialisation active
Indicates the time adjusted in tDTO, running backwards.
Filling time
FLL
ODB filling time active
Indicates the time adjusted in tFLL, running backwards.
Stabilisation
STAB
ODB stabilisation in progress
Indicates the time adjusted in tSTB, running backwards.
Confirmation
Completing the commissioning menu
After the last channel of the commissioning menu has
been adjusted and confirmed, the controller asks for
confirmation of the adjustments.
Î
In order to confirm the adjustments made in the
commissioning menu, press button 3.
The controller is then ready for operation with the
adjustments made for the system selected .
Note
The adjustments carried out during commis-
sioning can be changed anytime in the cor-
responding adjustment channel. Additional
functions and options can also be activated or
deactivated (see page 48).
Commissioning