background image

3

06/04/06 - 300008452-001-C

Remeha P 320

Introduction

Directive 97/23/EC

Gas and oil boilers with a maximum operating temperature of 110°C
and hot water tanks with a maximum operating pressure of 10 bar
pertain to article 3.3 of the directive, and therefore, cannot be CE-
marked to certify compliance with the directive 97/23 EC.
The boilers and hot water tanks are designed and manufactured in
accordance with the sound engineering practice, as requested in
article 3.3 of the directive 97/23/EC; it is certified by compliance with
the directives 90/396/EC, 92/42/EC, 73/23 EC and 89/336/EC.

Warning

The boiler shall be assembled and installed by a qualified
professional only.
For a proper operating of the boiler, follow carefully the instructions.

Symbols used  

Caution danger

Risk of injury and damage to equipment. Attention must be paid to the warnings on 

safety of persons and equipment

Specific information

Information must be kept in mind to maintain comfort

Z

Reference

Refer to another manual or other pages in this instruction manual

Содержание P 320-4

Страница 1: ...Remeha P 320 Fuel oil gas boilers Technical instructions English 06 04 06 63184 UK...

Страница 2: ...or connecting the boiler to the heating circuit 10 3 Filling the system 11 4 Sludge removal 11 Chimney connection 12 1 Flue size 12 2 Chimney connection 12 Fuel oil or gas connections 13 Electrical co...

Страница 3: ...engineering practice as requested in article 3 3 of the directive 97 23 EC it is certified by compliance with the directives 90 396 EC 92 42 EC 73 23 EC and 89 336 EC Warning The boiler shall be asse...

Страница 4: ...ned for connecting to a flue pipe which require a separate automatic fuel oil or gas burner The useful power of P 320 boilers is between 70 and 330 kW Models available Boiler with control panel which...

Страница 5: ...5 105 140 140 180 180 230 230 280 280 330 Power input kW 79 5 119 3 119 3 159 1 159 1 204 5 204 5 261 4 261 4 318 2 318 2 375 0 Number of sections 4 5 6 7 8 9 Water capacity l 96 116 136 156 176 196 W...

Страница 6: ...2 1 2 heating outlet flange counter flange c Sludge removal hole Rp 2 1 2 d 2 1 2 heating return flange counter flange e Rp 1 1 2 draining outlet supplied with plug P 320 4 P 320 5 P 320 6 P 320 7 P 3...

Страница 7: ...the floor can support the weight of the boiler when it is fitted for operation If the boiler location is not determined precisely leave enough space around the boiler to facilitate monitoring and main...

Страница 8: ...particularly corrosive These compounds are present for example in aerosol sprays paints solvents cleaning products washing products detergents glues snow clearing salts etc Therefore Do not suck in a...

Страница 9: ...domestic hot water production using an independent tank 1 Heating outlet 2 Heating return 3 3 bar safety valve manometer 5 Flow switch 6 Air separator 7 Automatic bleed valve 9 Isolation valve 10 3 wa...

Страница 10: ...the following formulae Nominal water flow Qn 0 86 Pn 20 Minimum flow Qmin 0 86 Pn 45 this flow also corresponds with the minimum recycle flow in the boiler Maximum water flow Qmax 0 86 Pn 5 Qn flow in...

Страница 11: ...y to an expansion vessel which opens out onto the air the system must include manual bleeder valves in addition to automatic bleeder valves with the capability to bleed the system by themselves when i...

Страница 12: ...ator is recommended as well 1 Flue size Refer to applicable regulations while determining the size of the flue Please note that P 320 boilers have pressurised and tight furnaces and that the pressure...

Страница 13: ...ctions supplied with the burner The burner head deflector must be flush with the insulation of the burner door A Furnace door insulation B 4 markings on 170 C 4 markings on 200 D 4 markings on 220 Ele...

Страница 14: ...uit Cut the power supply to the boiler Unhook the front panel Open the cleaning door top door by unscrewing the 4 closing nuts 17 mm spanner Remove the baffle plates Carefully sweep the four flue ways...

Страница 15: ...ater and dry with chamois leather or a soft cloth 3 Precautions required in the case of long boiler stops one or more years The boiler and the chimney must be swept carefully Close all the doors of th...

Страница 16: ...ion should be required only a few times in each heating season with very low quantities of water otherwise look for the leak and repair it 2 Draining We advise you against draining the system unless i...

Страница 17: ...17 06 04 06 300008452 001 C Remeha P 320 Spare parts P 320 To order a spare part quote the reference number next to the part required 06 04 06 UK300004553 002 A Boiler body...

Страница 18: ...18 Remeha P 320 06 04 06 300008452 001 C Insulation Base frame...

Страница 19: ...19 06 04 06 300008452 001 C Remeha P 320 Cladding Table RC 1...

Страница 20: ...21 8219 8953 Complete combustion chamber door 135 22 9425 0303 Internal protection combustion chamber door 23 9425 0302 Furnace door guard 24 9425 0301 Furnace door insulation 25 8015 7700 Sight glass...

Страница 21: ...panel right 8 sections 105 8553 8550 Complete side panel right 9 sections 106 8553 8551 Complete side panel left 4 sections 106 8553 8552 Complete side panel left 5 sections 106 8553 8553 Complete si...

Страница 22: ...Remeha P 320 06 04 06 300008452 001 C...

Страница 23: ...Remeha P 320 06 04 06 300008452 001 C...

Страница 24: ...ctions as well as any drawings and technical descriptions supplied remain our property and shall not be multiplied without our prior consent in writing Ours is a policy of continuous development We re...

Отзывы: