Reliance Water Heaters 650HTPDT Скачать руководство пользователя страница 34

34

NOTE:  Do  not  allow  insulation  or  other  materials  to  accumulate 

inside pipe assembly when installing through hole.

5.  Secure  assembly  to  roof  structure  as  shown  in  Figure  28 

using  field  supplied  metal  strapping  or  equivalent  support 

material.

NOTE: Ensure termination height is above the roof surface or 

anticipated snow level as shown in Figure 28.

6.  Install  rain  cap  and  small  diameter  pipe  assembly  in 

roof  penetration  assembly,  Ensure  small  diameter 

pipe  is  cemented  and  bottomed  in  Y  concentric  fitting.

 

7.  Cement water heater combustion air intake and vent pipes to 

 

concentric  vent  termination  assembly.  See  Figure  28  for 

 

proper pipe attachment.

8.  Operate heater through 1 heat cycle to ensure combustion 

air and vent pipes are properly connected to concentric vent 

termination connections.

FLAT ROOF INSTALLATION

When installing a concentric termination vertically through a flat 

roof, the termination’s vent cap must be a minimum of 10 feet (3 

m) away from any parapet, vertical wall or structure as shown 

in Figure 29.

If this required 10 foot (3 m) distance to a parapet, vertical wall 

or structure cannot be maintained, standard terminations must 

be used. See Vertical Vent Termination Installation.

CONCENTRIC TERMINATION(S)

MUST BE A MINIMUM OF 10 FEET

(3 m) AWAY FROM ANY PARAPET,

VERTICAL WALL OR 

STRUCTURE.

CONCENTRIC TERMINATION

FLAT ROOF CLEARANCE

Figure 29

INSTALLATION SIDE WALL TERMINATION

Figure 30

1. 

Determine best location for termination kit.

NOTE:  Consideration  for  the  following  should  be  used  when 

determining an appropriate location for the termination kit:
•  Termination kit positioned where the vent vapors will not damage 

plants/shrubs or air conditioning equipment. 

•  Termination kit positioned so it will not be affected by wind eddy 

that may allow recirculation of combustion products, or airborne 

leaves, or light snow.

•  Termination  kit  positioned  where  it  will  not  get  damaged  or  be 

subjected to foreign objects, such as stones, balls, etc. 

•  Termination  kit  positioned  where  the  vent  vapors  will  not  be 

objectionable. 

NOTE: See Venting Installation section (starting on Page 25) in this 

manual for additional vent location requirements.

2. 

Cut 1 hole (5 in. diameter).

3. 

Partially assemble concentric vent termination kit.

 

a) Cement the Y concentric fitting to larger diameter kit pipe, see 

Figure 25.

 

b) Cement the rain cap to the smaller diameter kit pipe, see Figure 

25.

NOTE:  Instead  of  cementing  the  smaller  pipe  to  the  rain  cap,  a 

field-supplied  stainless  steel  screw  may  be  used  to  secure  the  2 

components together when field disassembly is desired for cleaning, 

see Figure 27.

When using alternate screw assembly method, drill clearance hole 

in rain cap and pilot hole in vent pipe for screw being used. Failure 

to drill adequate holes may cause cracking of PVC components, 

allowing combustion products to be recirculated. Failure to follow 

this warning could result in personal injury or death.
Do not operate the heater with rain cap removed or recirculation 

of combustion products may occur. Water may also collect inside 

larger combustion-air pipe and flow to the burner enclosure. Failure 

to follow this warning could result in product damage or improper 

operation, personal injury or death.

4. 

Install Y concentric fitting and pipe assembly through structure’s 

hole.

NOTE: Do not allow insulation or other materials to accumulate 

inside pipe assembly when installing through hole. 

5. 

Install rain cap and small diameter pipe assembly in Y concentric 

fitting and large pipe assembly. Ensure small diameter pipe is 

bottomed and cemented in Y concentric fitting.

Содержание 650HTPDT

Страница 1: ...675 Y H TPDT SERIES 140 141 ALL TECHNICAL AND WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL CALL THE TECHNICAL SUPPORT PHON...

Страница 2: ...Installation 23 Installation Instructions 23 High Altitude Installations 23 Filling The Water Heater 23 INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS 24 VENTING INSTALLATION 25 Vent...

Страница 3: ...irth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical known to the State of California to cause cancer birth...

Страница 4: ...ogen is present there will probably be an unusual sound such as air escaping through the pipe as the water begins to flow THERE SHOULD BE NO SMOKING OR OPEN FLAME NEAR THE FAUCET AT THE TIME IT IS OPE...

Страница 5: ...5 GENERAL SAFETY INFORMATION...

Страница 6: ...read and understand instruction manual Breathing Hazard Carbon Monoxide Gas Property Damage Hazard All water heaters eventually leak Do not install without adequate drainage CAUTION Fire and Explosion...

Страница 7: ...installation of thermometers at the locations indicated in the piping diagrams as these are necessary for checking the operation of the water heater The principal components of the water heater are id...

Страница 8: ...IN DIMENSIONS Units A B C D E F G H I 50G Inches 66 75 49 25 22 00 15 75 3 00 8 00 8 00 62 00 65 00 cm 169 5 125 09 55 88 40 00 7 62 20 32 20 32 157 48 165 1 75G Inches 65 25 45 64 27 75 16 00 3 71 8...

Страница 9: ...ol Valve open All models Maximum Supply Pressure 14 inches W C 3 48kPa Minimum Supply Pressure for Natural Gas 3 50 87kPa Minimum Supply Pressure for Propane Gas 8 00 1 99kPa Minimum pressure must be...

Страница 10: ...EATURES AND COMPONENTS 24 18 35 31 9 4 2 3 19 29 20 22 23 21 1 12 16 25 11 17 33 13 26 27 34 SEE ACCESS PANEL CAUTION 28 30 32 21 18 5 14 15 Caution Thisaccesspanelcovers a 2 NPT plug that was require...

Страница 11: ...tion and Condensate Piping for more information VACUUM RELIEF VALVE INSTALL PER LOCAL CODES 75 GALLON UNIT FEATURES AND COMPONENTS CONT 24 18 35 31 9 4 2 3 19 22 23 21 1 12 17 25 11 29 5 18 21 20 16 2...

Страница 12: ...2 Top Plastic Enclosure 13 Display Enclosure 14 Exhaust Elbow Assembly 15 Condensate Drain Outlet 16 Enable Disable Switch 17 Display Overlay 18 Hot Water Outlet 19 Gas Supply 20 Main Manual Gas Shuto...

Страница 13: ...manual BLOCKED INTAKE SWITCH The Blocked Intake Switch is set up to shut the unit off when a build up of negative pressure in the intake air pipe occurs This switch is a negative pressure switch that...

Страница 14: ...quate supply of fresh air for combustion and ventilation can be obtained See Combustion Air and Ventilation on Page 15 9 Locate the water heater where the vent and intake air piping when installed wil...

Страница 15: ...per combustion potentially resultinginfire asphyxiation serious personalinjury ordeath Do not apply insulation to the top of the water heater as this will interfere with safe operation of the blower a...

Страница 16: ...ngs to provide fresh air must be provided that accommodate the requirements for all appliances in the room and the exhaust fan Undersized openings will cause air to be drawn into the room through the...

Страница 17: ...the bottom of the enclosure The horizontal ducts shall communicate directly with the outdoors See Figure 7 Each duct opening shall have a minimum free area of 1 square inch per 2 000 Btu hr 1100 mm2...

Страница 18: ...re changing the factory setting on the thermostat read the Temperature Regulation section in this manual This water heater shall not be connected to any heating systems or component s used with a non...

Страница 19: ...econds 149 65 1 second 2 seconds 154 67 8 instantaneous 1 second U S Government Memorandum C P S C Peter L Armstrong Sept 15 1978 GAS PIPING Make sure gas supplied is same type listed on model rating...

Страница 20: ...essure is measured while gas is not flowing static pressure AND while gas is flowing dynamic pressure SUPPLY GAS REGULATOR The maximum allowable gas supply pressure for this water heater is 14 inches...

Страница 21: ...check valves and back flow preventers Devices such as these cause the water system to be a closed system THERMAL EXPANSION As water is heated it expands thermal expansion In a closed system the volum...

Страница 22: ...ap must be on and tight when unit is in operation NOTE If the Blocked Exhaust Fault message is ever displayed on the control system LCD check the condensate drain first and ensure it is not blocked TE...

Страница 23: ...install an additional trap in the condensate drain piping See Figure 12 3 Terminate the condensate drain piping with an elbow above the drain Ensure that any discharge will exit the condensate drain l...

Страница 24: ...he horizontally vented gas fueled heating appliance or equipment The sign should read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS INSPEC...

Страница 25: ...chedule 40 80 ASTM F441 or CSA B137 6 SDR Series ASTM F442 Polypropylene See page 26 M G Duravent PolyPro vent system Centrotherm InnoFlue vent system NOTE The use of cellular core PVC ASTM F891 cellu...

Страница 26: ...lations Table 5 M G Duravent PolyPro Nominal Pipe Diameter Flue Outlet Adapter Adapter Connector Ring Connector 90 Degree Elbow Vent Material Terminal s 2 2PPS AD PPS PAC 2PPS LB 2PPS E90 2PPS 2PPS 2P...

Страница 27: ...igure 12 Figure 12 VENT TERMINATION VENT PIPE TERMINATION The first step is to determine where the vent pipe will terminate See Figures 12 through 20 The vent may terminate through a sidewall as shown...

Страница 28: ...side The template can now be positioned on the outside wall using the drilled holes as a centering point for the template A MASONRY SIDE WALLS Chisel an opening approximately 1 2 1 3 cm larger than th...

Страница 29: ...anical air supply inlet into building or combustion air inlet to any other appliance 4 feet 1 2 m below or to side of opening 1 foot 30 cm above opening D Vertical clearance to ventilated soffit locat...

Страница 30: ...mechanical air supply inlet into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 9 inches 23 cm for appliances between 10 000 Btu hr 3 kW...

Страница 31: ...ing 3 The air intake termination and the exhaust vent termination must penetrate the same side of roof 4 The center line of the air intake termination and the center line of the exhaust vent terminati...

Страница 32: ...MUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL 24 MINIMUM SEPARATION EXHAUST MUST BE AT SAME LEVEL OR ABOVE INTAKE TERMINAL SNORKELINGISALLOWEDTOACHIEVE PROPERCLEARANCE THESNORKEL MUSTBESECURELYSU...

Страница 33: ...less susceptible to damage has reduced chances to intake contaminants and less visible vent vapors 2 Cut 1 hole 5 in diameter 3 Partially assemble concentric vent termination kit a Cement Y concentric...

Страница 34: ...t Termination kit positioned so it will not be affected by wind eddy that may allow recirculation of combustion products or airborne leaves or light snow Termination kit positioned where it will not g...

Страница 35: ...gs to extend pipes Airflow restriction will occur and the heater pressure switch may cause intermittent operation 8 Cement heater combustion air and vent pipes to concentric vent termination assembly...

Страница 36: ...late 4 Screw the Cap to the Base using the supplied screws 5 Once the vent termination and pipes are secured the wall penetrations will need to be sealed from the interior using a PVC compatible seala...

Страница 37: ...don t smell gas go to the next step Set the ENABLE DISABLE switch on the control panel to the ENABLE position Set the ENABLE DISABLE switch on the control panel to the DISABLE position GAS OFF O N Sta...

Страница 38: ...the power supply to the water heater must be turned off and on again to reset the control system Contact your dealer or servicer if continued high limit switch operation occurs It is recommended that...

Страница 39: ...ulates water temperature inside the storage tank Heating cycles and ignition are managed by the control system The ECO energy cut out Flame Sensor pressure switches and Temperature Probe is monitored...

Страница 40: ...d The Blower Prover pressure switch contacts have closed The check mark icon is visual confirmation of contact closure The Igniter is being energized GAS OFF O N The 24 Volt Gas Control Valve is being...

Страница 41: ...front of the unit CONTROL SYSTEM MENUS From the Desktop screen pressing the Operational button directly below Menu on the LCD will display the Main Menu This is where all control system menus are loc...

Страница 42: ...on of control system menus Use the Up and Down Buttons to view all control system menus from the Main Menu With Temperatures menu selected highlighted in black in the Main Menu screen press the Operat...

Страница 43: ...ries greatly from the Operating Set Point setting These settings are adjusted in the same way described for the Operating Set Point and Differential Adjustment Operating Set Point 140 F Differential 8...

Страница 44: ...mulated time the control system has been in the heating operating state burner run time Total Cycle Count Total accumulated count of heating cycles Config CRC A number associated with the configuratio...

Страница 45: ...t event will replace the oldest Press the Operational Button under VIEW to view details for each Fault or Alert message stored NOTE fault history memory is cleared after 30 days 1 Blocked Air Intake A...

Страница 46: ...m Show Contact Information Yes Change Contact Name Change Contact Phone Current Contact Info 000 000 0000 Access Code UPDATE CANCEL Service Contact Information Using the UP and DOWN buttons select hig...

Страница 47: ...etween this rod and the water The most common complaint associated with the anode rod is one of a rotten egg smell in the hot water The smell is a result of four factors which must all be present for...

Страница 48: ...conditions will cause a reaction between the anode rod and the water The most common complaint associated with the anode rod is a rotten egg smell produced from the presence of hydrogen sulfide gas d...

Страница 49: ...n the water heater see Draining and Flushing on page 49 Replace the Temperature Pressure Relief Valve with a properly rated sized new one see Temperature Pressure Relief Valve on Page 22 for instructi...

Страница 50: ...nd terminate it to an adequate drain 5 Ensure the drain hose is secured before and during the entire flushing procedure Flushing is performed with system water pressure applied to the water heater 6 O...

Страница 51: ...tting G Leakage from recirculation plug or pipe connection H Leakage from the plug under the cleanout cover I Leakage from the temperature probe connection Not shown in figure J Condensate from the ex...

Страница 52: ...blower is de energized and will coast to a stop 12 The control system now enters the standby mode while continuing to monitor the internal storage tank water temperature and the state of other system...

Страница 53: ...le is activated Blower Prover switch contacts confirmed closed by control system Igniter is energized 24 V Gas Valve is energized gas flows to Main Burner Is flame sensed at the Main Burner control sy...

Страница 54: ...l Number and Series Number available This information can be found on the rating plate affixed to the water heater For more information or technical support call the phone number s listed on the back...

Страница 55: ...eater before performing any service Electrical Shock Hazard Label all wires prior to disconnecting when performing service Wiring errors can cause improper and dangerous operation Verify proper operat...

Страница 56: ...nce Switch should be closed continuity 0 ohms Replace switch if open no continuity If Blocked Intake error occurs when blower is running check for restrictions in intake pipe including intake air conn...

Страница 57: ...TION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING Figure 42 WIRING SCHEMATIC WIRING D...

Страница 58: ...58 NOTES...

Страница 59: ...59 NOTES...

Страница 60: ...60...

Отзывы: