Reliance Water Heaters 650HTPDT Скачать руководство пользователя страница 22

22

T&P VALVE DISCHARGE PIPE REQUIREMENTS:

•  Shall not be smaller in size than the outlet pipe size of the valve, 

or have any reducing couplings or other restrictions.

•  Shall not be plugged or blocked.
•  Shall not be exposed to freezing temperatures.
•  Shall be of material listed for hot water distribution.
•  Shall be installed so as to allow complete drainage of both the 

Temperature-Pressure Relief Valve and the discharge pipe.

•  Must  terminate  a  maximum  of  six  inches  (15.2  cm)  above  a 

floor  drain  or  external  to  the  building.  In  cold  climates,  it  is 

recommended  that  the  discharge  pipe  be  terminated  at  an 

adequate drain inside the building.

•  Shall  not  have  any  valve  or  other  obstruction  between  the 

temperature-pressure relief valve and the drain.

Burn hazard.

Hot water discharge.

Keep clear of Temperature-

Pressure Relief Valve

discharge outlet.

The  Temperature-Pressure  Relief  Valve  must  be  manually 

operated at least twice a year. Caution should be taken to ensure 

that (1) no one is in front of or around the outlet of the Temperature-

Pressure Relief Valve discharge line, and (2) the water manually 

discharged  will  not  cause  any  bodily  injury  or  property  damage 

because  the  water  may  be  extremely  hot.  If  after  manually 

operating the valve, it fails to completely reset and continues to 

release water, immediately close the cold water inlet to the water 

heater, follow the draining instructions in this manual, and replace 

the Temperature-Pressure Relief Valve with a properly rated/sized 

new one.

NOTE:

 The purpose of a Temperature-Pressure Relief Valve is to 

prevent excessive temperatures and pressures in the storage tank. 

The  T&P  valve  is  not  intended  for  the  constant  relief  of  thermal 

expansion.  A  properly  sized  thermal  expansion  tank  must  be 

installed  on  all  closed  systems  to  control  thermal  expansion,  see 

Closed Water Systems and Thermal Expansion on Page 21.
If you do not understand these instructions or have any questions 

regarding  the  Temperature-Pressure  Relief  Valve  call  the  toll 

free number listed on the back cover of this manual for technical 

assistance.

CONDENSATE PIPING

The  water  heaters  covered  in  this  manual  are  condensing 

appliances  and  require  a  building  drain  to  be  located  in  close 

proximity to allow the condensate to drain safely.
Condensate  drains  from  the  water  heater  at  the  exhaust  elbow 

located  at  the  bottom.  The  field  installed  condensate  drain  line 

must not be elevated above the condensate drain connection on 

the  condensate  trap,  see  Figure  11.  If  the  condensate  does  not 

drain properly it will build up in the exhaust (vent) elbow. This will 

restrict  the  flow  of  flue  gases  and  cause  the  Blocked  Exhaust 

pressure switch to open its contacts. The control system monitors 

all pressure switches, if the Blocked Exhaust Switch contacts are 

open the control system will lock out and disable heating operation. 

The  “Blocked  Exhaust”  Fault  message  will  be  displayed  on  the 

control system’s LCD.
The Condensate Cleanout Cap must be on and tight when unit is 

in operation.

NOTE:

 If the “Blocked Exhaust “ Fault message is ever displayed 

on the control system LCD, check the condensate drain first and 

ensure it is not blocked.

TEMPERATURE-PRESSURE RELIEF VALVE

This water heater is provided with a properly rated/sized and certified 

combination Temperature-Pressure Relief Valve (T&P relief valve) by 

the manufacturer. The valve is certified by a nationally recognized 

testing laboratory that maintains periodic inspection of production of 

listed equipment of materials as meeting the requirements for Relief 

Valves for Hot Water Supply Systems, ANSI Z21.22 • CSA 4.4, and 

the code requirements of ASME.
If replaced, the new T&P valve must meet the requirements of local 

codes, but not less than a combination Temperature-Pressure Relief 

Valve rated/sized and certified as indicated in the above paragraph. The 

new valve must be marked with a maximum set pressure not to exceed 

the marked hydrostatic working pressure of the water heater (150 psi = 

1,035 kPa) and a discharge capacity not less than the water heater Btu/

hr or kW input rate as shown on the water heater’s model rating plate.

NOTE:

  In  addition  to  the  factory  installed  Temperature-Pressure 

Relief Valve on the water heater, each remote storage tank that may 

be installed and piped to a water heating appliance must also have 

its  own  properly  sized,  rated  and  approved Temperature-Pressure 

Relief Valve installed.

Explosion Hazard

Temperature-Pressure Relief Valve

must comply with ANSI Z21.22-

CSA 4.4 and ASME code.

Properly sized temperature-

pressure relief valve must be

installed in opening provided.

Can result in overheating and

excessive tank pressure.

Can cause serious injury or death.

For safe operation of the water heater, the Temperature-Pressure 

Relief Valve must not be removed from its designated opening nor 

plugged. The Temperature-Pressure Relief Valve must be installed 

directly into the fitting of the water heater designed for the relief valve. 

Install discharge piping so that any discharge will exit the pipe within 

6 inches (15.2 cm) above an adequate floor drain, or external to the 

building. In cold climates it is recommended that it be terminated at 

an adequate drain inside the building. Be certain that no contact is 

made with any live electrical part. The discharge opening must not 

be blocked or reduced in size under any circumstances. Excessive 

length, over 30 feet (9.14 m), or use of more than four elbows can 

cause restriction and reduce the discharge capacity of the valve.
No  valve  or  other  obstruction  is  to  be  placed  between  the 

Temperature-Pressure Relief Valve and the tank. Do not connect 

discharge piping directly to the drain unless a 6” (15.2 cm) air gap 

is  provided.  To  prevent  bodily  injury,  hazard  to  life,  or  property 

damage,  the  temperature-pressure  relief  valve  must  be  allowed 

to  discharge  water  in  adequate  quantities  should  circumstances 

demand. If the discharge pipe is not connected to a drain or other 

suitable means, the water flow may cause property damage.

Water Damage Hazard

Temperature-Pressure Relief Valve discharge

pipe must terminate at adequate drain.

CAUTION

Содержание 650HTPDT

Страница 1: ...675 Y H TPDT SERIES 140 141 ALL TECHNICAL AND WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL CALL THE TECHNICAL SUPPORT PHON...

Страница 2: ...Installation 23 Installation Instructions 23 High Altitude Installations 23 Filling The Water Heater 23 INSTALLATION REQUIREMENTS FOR THE COMMONWEALTH OF MASSACHUSETTS 24 VENTING INSTALLATION 25 Vent...

Страница 3: ...irth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical known to the State of California to cause cancer birth...

Страница 4: ...ogen is present there will probably be an unusual sound such as air escaping through the pipe as the water begins to flow THERE SHOULD BE NO SMOKING OR OPEN FLAME NEAR THE FAUCET AT THE TIME IT IS OPE...

Страница 5: ...5 GENERAL SAFETY INFORMATION...

Страница 6: ...read and understand instruction manual Breathing Hazard Carbon Monoxide Gas Property Damage Hazard All water heaters eventually leak Do not install without adequate drainage CAUTION Fire and Explosion...

Страница 7: ...installation of thermometers at the locations indicated in the piping diagrams as these are necessary for checking the operation of the water heater The principal components of the water heater are id...

Страница 8: ...IN DIMENSIONS Units A B C D E F G H I 50G Inches 66 75 49 25 22 00 15 75 3 00 8 00 8 00 62 00 65 00 cm 169 5 125 09 55 88 40 00 7 62 20 32 20 32 157 48 165 1 75G Inches 65 25 45 64 27 75 16 00 3 71 8...

Страница 9: ...ol Valve open All models Maximum Supply Pressure 14 inches W C 3 48kPa Minimum Supply Pressure for Natural Gas 3 50 87kPa Minimum Supply Pressure for Propane Gas 8 00 1 99kPa Minimum pressure must be...

Страница 10: ...EATURES AND COMPONENTS 24 18 35 31 9 4 2 3 19 29 20 22 23 21 1 12 16 25 11 17 33 13 26 27 34 SEE ACCESS PANEL CAUTION 28 30 32 21 18 5 14 15 Caution Thisaccesspanelcovers a 2 NPT plug that was require...

Страница 11: ...tion and Condensate Piping for more information VACUUM RELIEF VALVE INSTALL PER LOCAL CODES 75 GALLON UNIT FEATURES AND COMPONENTS CONT 24 18 35 31 9 4 2 3 19 22 23 21 1 12 17 25 11 29 5 18 21 20 16 2...

Страница 12: ...2 Top Plastic Enclosure 13 Display Enclosure 14 Exhaust Elbow Assembly 15 Condensate Drain Outlet 16 Enable Disable Switch 17 Display Overlay 18 Hot Water Outlet 19 Gas Supply 20 Main Manual Gas Shuto...

Страница 13: ...manual BLOCKED INTAKE SWITCH The Blocked Intake Switch is set up to shut the unit off when a build up of negative pressure in the intake air pipe occurs This switch is a negative pressure switch that...

Страница 14: ...quate supply of fresh air for combustion and ventilation can be obtained See Combustion Air and Ventilation on Page 15 9 Locate the water heater where the vent and intake air piping when installed wil...

Страница 15: ...per combustion potentially resultinginfire asphyxiation serious personalinjury ordeath Do not apply insulation to the top of the water heater as this will interfere with safe operation of the blower a...

Страница 16: ...ngs to provide fresh air must be provided that accommodate the requirements for all appliances in the room and the exhaust fan Undersized openings will cause air to be drawn into the room through the...

Страница 17: ...the bottom of the enclosure The horizontal ducts shall communicate directly with the outdoors See Figure 7 Each duct opening shall have a minimum free area of 1 square inch per 2 000 Btu hr 1100 mm2...

Страница 18: ...re changing the factory setting on the thermostat read the Temperature Regulation section in this manual This water heater shall not be connected to any heating systems or component s used with a non...

Страница 19: ...econds 149 65 1 second 2 seconds 154 67 8 instantaneous 1 second U S Government Memorandum C P S C Peter L Armstrong Sept 15 1978 GAS PIPING Make sure gas supplied is same type listed on model rating...

Страница 20: ...essure is measured while gas is not flowing static pressure AND while gas is flowing dynamic pressure SUPPLY GAS REGULATOR The maximum allowable gas supply pressure for this water heater is 14 inches...

Страница 21: ...check valves and back flow preventers Devices such as these cause the water system to be a closed system THERMAL EXPANSION As water is heated it expands thermal expansion In a closed system the volum...

Страница 22: ...ap must be on and tight when unit is in operation NOTE If the Blocked Exhaust Fault message is ever displayed on the control system LCD check the condensate drain first and ensure it is not blocked TE...

Страница 23: ...install an additional trap in the condensate drain piping See Figure 12 3 Terminate the condensate drain piping with an elbow above the drain Ensure that any discharge will exit the condensate drain l...

Страница 24: ...he horizontally vented gas fueled heating appliance or equipment The sign should read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS INSPEC...

Страница 25: ...chedule 40 80 ASTM F441 or CSA B137 6 SDR Series ASTM F442 Polypropylene See page 26 M G Duravent PolyPro vent system Centrotherm InnoFlue vent system NOTE The use of cellular core PVC ASTM F891 cellu...

Страница 26: ...lations Table 5 M G Duravent PolyPro Nominal Pipe Diameter Flue Outlet Adapter Adapter Connector Ring Connector 90 Degree Elbow Vent Material Terminal s 2 2PPS AD PPS PAC 2PPS LB 2PPS E90 2PPS 2PPS 2P...

Страница 27: ...igure 12 Figure 12 VENT TERMINATION VENT PIPE TERMINATION The first step is to determine where the vent pipe will terminate See Figures 12 through 20 The vent may terminate through a sidewall as shown...

Страница 28: ...side The template can now be positioned on the outside wall using the drilled holes as a centering point for the template A MASONRY SIDE WALLS Chisel an opening approximately 1 2 1 3 cm larger than th...

Страница 29: ...anical air supply inlet into building or combustion air inlet to any other appliance 4 feet 1 2 m below or to side of opening 1 foot 30 cm above opening D Vertical clearance to ventilated soffit locat...

Страница 30: ...mechanical air supply inlet into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 9 inches 23 cm for appliances between 10 000 Btu hr 3 kW...

Страница 31: ...ing 3 The air intake termination and the exhaust vent termination must penetrate the same side of roof 4 The center line of the air intake termination and the center line of the exhaust vent terminati...

Страница 32: ...MUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL 24 MINIMUM SEPARATION EXHAUST MUST BE AT SAME LEVEL OR ABOVE INTAKE TERMINAL SNORKELINGISALLOWEDTOACHIEVE PROPERCLEARANCE THESNORKEL MUSTBESECURELYSU...

Страница 33: ...less susceptible to damage has reduced chances to intake contaminants and less visible vent vapors 2 Cut 1 hole 5 in diameter 3 Partially assemble concentric vent termination kit a Cement Y concentric...

Страница 34: ...t Termination kit positioned so it will not be affected by wind eddy that may allow recirculation of combustion products or airborne leaves or light snow Termination kit positioned where it will not g...

Страница 35: ...gs to extend pipes Airflow restriction will occur and the heater pressure switch may cause intermittent operation 8 Cement heater combustion air and vent pipes to concentric vent termination assembly...

Страница 36: ...late 4 Screw the Cap to the Base using the supplied screws 5 Once the vent termination and pipes are secured the wall penetrations will need to be sealed from the interior using a PVC compatible seala...

Страница 37: ...don t smell gas go to the next step Set the ENABLE DISABLE switch on the control panel to the ENABLE position Set the ENABLE DISABLE switch on the control panel to the DISABLE position GAS OFF O N Sta...

Страница 38: ...the power supply to the water heater must be turned off and on again to reset the control system Contact your dealer or servicer if continued high limit switch operation occurs It is recommended that...

Страница 39: ...ulates water temperature inside the storage tank Heating cycles and ignition are managed by the control system The ECO energy cut out Flame Sensor pressure switches and Temperature Probe is monitored...

Страница 40: ...d The Blower Prover pressure switch contacts have closed The check mark icon is visual confirmation of contact closure The Igniter is being energized GAS OFF O N The 24 Volt Gas Control Valve is being...

Страница 41: ...front of the unit CONTROL SYSTEM MENUS From the Desktop screen pressing the Operational button directly below Menu on the LCD will display the Main Menu This is where all control system menus are loc...

Страница 42: ...on of control system menus Use the Up and Down Buttons to view all control system menus from the Main Menu With Temperatures menu selected highlighted in black in the Main Menu screen press the Operat...

Страница 43: ...ries greatly from the Operating Set Point setting These settings are adjusted in the same way described for the Operating Set Point and Differential Adjustment Operating Set Point 140 F Differential 8...

Страница 44: ...mulated time the control system has been in the heating operating state burner run time Total Cycle Count Total accumulated count of heating cycles Config CRC A number associated with the configuratio...

Страница 45: ...t event will replace the oldest Press the Operational Button under VIEW to view details for each Fault or Alert message stored NOTE fault history memory is cleared after 30 days 1 Blocked Air Intake A...

Страница 46: ...m Show Contact Information Yes Change Contact Name Change Contact Phone Current Contact Info 000 000 0000 Access Code UPDATE CANCEL Service Contact Information Using the UP and DOWN buttons select hig...

Страница 47: ...etween this rod and the water The most common complaint associated with the anode rod is one of a rotten egg smell in the hot water The smell is a result of four factors which must all be present for...

Страница 48: ...conditions will cause a reaction between the anode rod and the water The most common complaint associated with the anode rod is a rotten egg smell produced from the presence of hydrogen sulfide gas d...

Страница 49: ...n the water heater see Draining and Flushing on page 49 Replace the Temperature Pressure Relief Valve with a properly rated sized new one see Temperature Pressure Relief Valve on Page 22 for instructi...

Страница 50: ...nd terminate it to an adequate drain 5 Ensure the drain hose is secured before and during the entire flushing procedure Flushing is performed with system water pressure applied to the water heater 6 O...

Страница 51: ...tting G Leakage from recirculation plug or pipe connection H Leakage from the plug under the cleanout cover I Leakage from the temperature probe connection Not shown in figure J Condensate from the ex...

Страница 52: ...blower is de energized and will coast to a stop 12 The control system now enters the standby mode while continuing to monitor the internal storage tank water temperature and the state of other system...

Страница 53: ...le is activated Blower Prover switch contacts confirmed closed by control system Igniter is energized 24 V Gas Valve is energized gas flows to Main Burner Is flame sensed at the Main Burner control sy...

Страница 54: ...l Number and Series Number available This information can be found on the rating plate affixed to the water heater For more information or technical support call the phone number s listed on the back...

Страница 55: ...eater before performing any service Electrical Shock Hazard Label all wires prior to disconnecting when performing service Wiring errors can cause improper and dangerous operation Verify proper operat...

Страница 56: ...nce Switch should be closed continuity 0 ohms Replace switch if open no continuity If Blocked Intake error occurs when blower is running check for restrictions in intake pipe including intake air conn...

Страница 57: ...TION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING Figure 42 WIRING SCHEMATIC WIRING D...

Страница 58: ...58 NOTES...

Страница 59: ...59 NOTES...

Страница 60: ...60...

Отзывы: