background image

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

Crash-Rated Bollard Installation

Embedded

R-1009-12

Removing the Bollard

This bollard can be removed when necessary and covered with a 

bollard sleeve cap.

STEP 13: 

Find the hollow internal tube at the top of the 

bollard. 

STEP 14: 

Insert a construction pipe through this tube and 

ensure it is centered. The construction pipe will act as a 

lifting handle.

STEP 15: 

Raise the construction pipe and lift the bollard 

out of the bollard sleeve. 

Note: Crash-rated bollards are 

heavy—to prevent accidents and injuries, ensure the proper 

resources are available for lifting.

STEP 16: 

Cover the opening of the bollard sleeve with the 

bollard sleeve cap to prevent tripping hazards and debris 

from getting inside.

Inspect the installation

. Abrasions should 

be covered as soon as possible. For damage 

repair or other servicing needs, please contact 

Reliance Foundry’s sales department.

STEP 16

STEP 15

Construction Pipe

Отзывы: