1-877-789-3245 | [email protected] | www.reliance-foundry.com
Crash-Rated Bollard Installation
Embedded
R-1009-12
Removing the Bollard
This bollard can be removed when necessary and covered with a
bollard sleeve cap.
STEP 13:
Find the hollow internal tube at the top of the
bollard.
STEP 14:
Insert a construction pipe through this tube and
ensure it is centered. The construction pipe will act as a
lifting handle.
STEP 15:
Raise the construction pipe and lift the bollard
out of the bollard sleeve.
Note: Crash-rated bollards are
heavy—to prevent accidents and injuries, ensure the proper
resources are available for lifting.
STEP 16:
Cover the opening of the bollard sleeve with the
bollard sleeve cap to prevent tripping hazards and debris
from getting inside.
Inspect the installation
. Abrasions should
be covered as soon as possible. For damage
repair or other servicing needs, please contact
Reliance Foundry’s sales department.
STEP 16
STEP 15
Construction Pipe