EĆ5
L0
Therunbaseneeds to beloaded onto therack
b0
Rack configuration is being validated
d0
Application task installation in progress
d1
Waiting on synchronizing event (in a rack with
multipleprocessors)
d2
Waiting on mutual exclusion lock (in a rack with
multipleprocessors)
Corrective action for b0 and d0 that do not change or disappear: reĆload
configuration fileand application tasks.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com