background image

 

 

I. Finishing Up

 

 

According to your individual installation requirements, after you have completed all the steps necessary leading up to this point, complete 
the system installation by doing the following:

 

1. 

Turn on all of the circuit breakers in your load center.

 

2. 

Turn on the main breaker.

 

3. 

Position all switches on the transfer switch to the LINE  position.

 

4. 

IMPORTANT!  

In order to insure that all wiring connections have been properly completed and that your system functions properly under 

generator power, it is important to test each circuit before turning on any devices or appliances connected to that circuit. Correct voltage 
output can and should be checked with a voltage meter at any convenient electrical outlet on each branch circuit that is wired through the 
transfer switch. This should be done under generator power with the appropriate circuit toggle switch in the “GEN” position.  It’s best to 
test 1 circuit at a time. 

 

 

 

 

Generator and Transfer Switch Maintenance 

You want your generator to be ready when you need it – so, it is important to maintain your generator according to your generator manual and 
manufacturer’s suggested maintenance.  We recommend that you run your generator’s power through the transfer switch periodically to 
insure that everything is operating properly and that you are ready for the next power outage.

 

 

 

Operation of Transfer Switch 

With your Reliance Controls transfer switch installed, it is not necessary to turn off any of your load center breakers when starting your 
generator, even when utility power is fully functional. This is because the double throw break-before-make action of the transfer 
switch toggle switches prevents feeding generator power to the utility and, conversely, prevents feeding utility power back to your 
generator

 

 

A. Transferring from Utility Power to Generator Power in an Emergency

 

1. 

Make sure that all switches on the Reliance Controls transfer switch are in the LINE position.

 

2. 

Plug the male end of your power cord into the generator.

 

3. 

Plug the female end of your power cord into the outdoor power inlet box.

 

4. 

Start your generator outdoors and let it warm up, as instructed in your generator manual. 

 

5. 

Turn the toggle switches on your Reliance transfer switch to the GEN position one at a time.

 

If you have a Reliance transfer switch with watt meters, you can monitor the power that is being used by your generator.

 

B. Transferring back to Utility Power When the 

Power Is Restored

 

1. 

Move all switches on the Reliance Controls transfer switch back to 

the LINE position.

 

2. 

Turn off your generator.

 

3. 

Unplug your power cord and store it. 

 

 
 
 

AFCI and GFCI Circuit Breakers:

 

can be installed in this transfer switch, specific wiring methods are necessary.  

Accessory wiring kits and neutral bars are available. Please contact us directly for more information on adding or connecting to 
AFCI/GFCI type breakers.   

 
 

Содержание PRI/TRAN 2 RN Series

Страница 1: ...n this Manual 1 About Generators and Transfer Switches 2 Key Product Components 3 Pre Planning the Load on Your Generator 4 Installation Instructions 5 Mounting the Transfer Switch 5 Connecting the Co...

Страница 2: ...dicates a potentially hazardous situation that if not avoided could result in death or serious injury Caution indicates a potentially hazardous situation that if not avoided may result in minor or mod...

Страница 3: ...little pre planning by 1 Picking the key electrical appliances you want to power in an emergency 2 Finding the essential circuit breakers that control these devices 3 Creating a map of all of the othe...

Страница 4: ...ion stops the power from the branch circuit from both utility and generator power at the circuit toggle switch Handle ties Handle ties are inserted into two adjacent toggle switches and are used for 2...

Страница 5: ...lan the setup of your transfer switch Use the running watts of your appliances rather than starting watts when dividing them between the two halves of the transfer switch Check your appliances for act...

Страница 6: ...up battery powered lighting to clearly illuminate your work area 2 Turn off the main utility breaker Figure 3 3 Remove the cover of your load center Keep in mind that the wires on the utility side of...

Страница 7: ...ter Do not connect transfer switch circuits to any branch circuits greater than 20 Amps except circuits A B which may be connected to 30 Amp circuits Any of the breakers can be changed NOTE The transf...

Страница 8: ...n the chart on the transfer switch to identify your emergency circuits and the toggle switches they correspond to 3 Do not turn the main and individual circuit breakers in your load center back on unt...

Страница 9: ...let plug insert the white wire into the hole marked W and tighten the screw on the side of the plug Do the same with the red wire into the hole marked X and the black wire into the hole marked Y NOTE...

Страница 10: ...perating properly and that you are ready for the next power outage Operation of Transfer Switch WithyourRelianceControlstransferswitchinstalled itisnotnecessary toturnoffanyofyourloadcenterbreakerswhe...

Страница 11: ...10 TRANSFER SWITCH PRODUCT SPECIFICATIONS NOTES...

Страница 12: ...A B C D E F Controls these essential appliances I will need during a power outage So I will need to turn these other devices off which are on the same circuits HOME CIRCUIT MAPPING CHART...

Страница 13: ...and Reliance shall not be liable for any incidental special or consequential damages The cost of labor to remove or install a replacement component or Switch is not included in this warranty The foreg...