UPPER

DECK

4-1/2 in. (114 mm) MINIMUM FROM
CENTERLINE OF SPRINKLER TO

FACE OF TOP CHORD OF WOOD

TRUSS OR BAR JOIST

OBSTRUCTION

CEILING

6 in. (150 mm)

MAXIMUM

WHEN OFFSETTING CPVC PIPE OVER AN
OBSTRUCTION, A CCS SPRINKLER MUST BE

INSTALLED DIRECTLY ON THE PIPE OVER THE
OBSTRUCTION. MAINTAIN 18 in. (460 mm)
CLEARANCE TO HEAT PUMPS, FAN MOTORS,
HEAT LAMPS, OR OTHER HEAT SOURCES.

SEE NOTE 2

INSTALLATION NOTES:

1.

DISTANCE EVALUATED AS PART OF THE cULus LISTING: 12 in. TO 60 in. (300 mm TO 1500 mm). NFPA 13 PERMITS INSTALLATION OF THE
SPRINKLER WHERE THIS DISTANCE IS LESS THAN 12  in. (300 mm).

2.

DEFLECTOR TO BE NO MORE THAN 2 in. (50 mm) MAXIMUM BELOW BOTTOM OF TOP CHORD. IN NO CASE SHALL DEFLECTOR BE

ABOVE THE BOTTOM OF THE TOP CHORD.

3.

INSTALL SPRINKLER WITH FRAME ARMS PARALLEL TO PIPE.

PIPE SHALL BE LOCATED A MAXIMUM OF 6 in. (150 mm) ABOVE
THE TOP OF THE CEILING (OR INSULATION), OR A MAXIMUM OF
ONE-THIRD (1/3) THE DEPTH OF THE CONCEALED SPACE ABOVE
THE TOP OF THE CEILING, WHICHEVER IS SMALLER.

SEE NOTE 1

HYDRAULIC DESIGN AREA REQUIREMENTS

A.

WET SYSTEM:  WHERE DRAFT CURTAINS (OR FULL HEIGHT WALLS) ARE PROVIDED AT MAXIMUM AREAS OF 1000 ft

2

 (93 m

2

) OR LESS,

CALCULATE ALL SPRINKLERS WITHIN THE COMPARTMENTED AREA.

B.

WET SYSTEM:  WHERE DRAFT CURTAINS (OR FULL HEIGHT WALLS) ARE NOT PROVIDED, OR PROVIDED AT AREAS EXCEEDING 1000 ft

2

 (93

m

2

), CALCULATE AN AREA OF 1000 ft

2

 (93 m

2

) OR SIX SPRINKLERS, WHICHEVER CREATES THE GREATER DEMAND.

C.

ADDITIONAL SPRINKLERS THAT ARE REQUIRED FOR PROTECTION OF CPVC PIPING THAT IS OFFSET OVER AN OBSTRUCTION DO NOT

NEED TO BE INCLUDED IN THE DESIGN AREA.

NOTE 3

SPRINKLER SPACING AND COVERAGE AREA

A. 16 ft (4.9 m) MAXIMUM BETWEEN SPRINKLERS

B.

6 ft (1.8 m) MINIMUM BETWEEN SPRINKLERS (DOES NOT APPLY TO SPRINKLERS ADDED TO PROTECT CPVC PIPING OFFSET OVER AN
OBSTRUCTION)

C.

256 ft

2

 (23.8 m

2

) MAXIMUM COVERAGE AREA PER SPRINKLER

6 in. (150 mm)

MAXIMUM

TOP CHORD DEPTH 4 in.
(100 mm) OR LESS

Figure 2

Unobstructed Wood Truss or Bar Joist, CPVC Pipe 

Bulletin 044
December 2022

Page 4 of 9

www.reliablesprinkler.com

Draft Curtains: Optional

Содержание KFR-CCS

Страница 1: ...damage the sprinkler and will void the manufacturer s warranty Damaged sprinklers must be immediately replaced A leak tight NPT R1 2 sprinkler joint can be obtained with an installation torque of appr...

Страница 2: ...onal sprinklers that are required for protection of CPVC piping that is offset over an obstruction Maximum Distance Spacing Between Sprinklers Refer to Figures 2 through 7 Maximum Coverage Area Per Sp...

Страница 3: ...whichever is smaller Where the members at the bottom of the concealed space are greater than 6 in 150 mm tall installing CPVC piping directly on top of those members shall be permitted When using 1 i...

Страница 4: ...NCEALED SPACE ABOVE THE TOP OF THE CEILING WHICHEVER IS SMALLER SEE NOTE 1 HYDRAULIC DESIGN AREA REQUIREMENTS A WET SYSTEM WHERE DRAFT CURTAINS OR FULL HEIGHT WALLS ARE PROVIDED AT MAXIMUM AREAS OF 10...

Страница 5: ...E PROVIDED AT MAXIMUM AREAS OF 1000 ft2 93 m2 OR LESS CALCULATE ALL SPRINKLERS WITHIN THE COMPARTMENTED AREA 2 WET SYSTEM WHERE DRAFT CURTAINS OR FULL HEIGHT WALLS ARE NOT PROVIDED OR PROVIDED AT AREA...

Страница 6: ...R WHERE THIS DISTANCE IS LESS THAN 12 in 300 mm 1A WHERE CEILING IS NOT SUPPORTED BY JOISTS EXAMPLE SUSPENDED A C T MEASUREMENT POINT IS TOP OF CEILING 2 DEFLECTOR DISTANCE BELOW BOTTOM OF JOIST TO 1...

Страница 7: ...S THAN 12 in 300 mm 2 DEFLECTOR DISTANCE BELOW BOTTOM OF JOIST TO 1 1 2 in TO 4 in 38 mm TO 100 mm BELOW BOTTOM OF TOP CHORD IN NO CASE SHALL DEFLECTOR BE ABOVE THE BOTTOM OF THE SOLID OR COMPOSITE WO...

Страница 8: ...NOT SUPPORTED BY JOISTS EXAMPLE SUSPENDED A C T MEASUREMENT POINT IS TOP OF CEILING 2 DEFLECTOR DISTANCE BELOW BOTTOM OF JOIST TO 1 1 2 in TO 4 in 38 mm TO 100 mm BELOW BOTTOM OF TOP CHORD IN NO CASE...

Страница 9: ...C T MEASUREMENT POINT IS TOP OF CEILING 2 DEFLECTOR DISTANCE BELOW BOTTOM OF JOIST TO 1 1 2 in TO 4 in 38 mm TO 100 mm BELOW BOTTOM OF TOP CHORD IN NO CASE SHALL DEFLECTOR BE ABOVE THE BOTTOM OF THE S...

Отзывы: